IG-308-EN version 01; 03/06/2022
18
Installation
General instructions
cgm
.3-huv system: Fully gas-insulated
medium-voltage switchgear
4.4.1. Cubicles with internal arc classification IAC up to 25 kA - 1 s
[7]
In each case, bear in mind which cable is to be used in the installation.
Feeder and cable rise function
Front and rear cable input or output (D1)
Side cable input or output (D2)
Figure 4.3.
Dimensions [mm] of the cable trench for
cgm
.3-huv-l
and
cgm
.3-huv-rc
Trench necessary for the feeder and cable rise function
Cable details
Approximate
radius of
curvature*
[mm]
Minimum depth
Cable insulation
Cable type
Cable
section
[mm
2
]
Cable
diameter
[mm]
D1 [mm]
D2 [mm]
H
eigh
t
1400 mm***
Dry insulation
One-core 18/30 kV
< 150**
41
555
500
800
185
43
590
550
900
240
45.2
640
300
47.5
685
650
1000
400
48
745
Three-core 18/30
kV
< 150
92.7
805
950
950
H
eigh
t
1745 mm
Dry insulation
One-core 18/30 kV
< 150**
41
555
370
500
185
43
590
370
550
240
45.2
640
300
47.5
685
370
660
400
48
745
Three-core 18/30
kV
< 150
92.7
805
650
650
* Check against the data of the manufacturer of the cable used.
** 150 mm
2
cable valid up to 21 kA.
*** Exclusively for -l cubicles.
Table 4.2.
Trench necessary for the feeder and cable rise function