4.3.2 Checkpoints while baling
No Checkpoint prior to baling
1
Continuously observe all moving parts and functions.
2
Check the tracking of both chamber belts (leveling will affect the tracking).
3
Check the greasing pump function.
4
Check the chain lubrication system (Dry chains?).
5
Check the condition and cleaning of chamber rollers. Too much material on the rollers will affect the track-
ing of the chamber belts.
6
Avoid overfilling of the space between the elevator and sub conveyor. (Easily avoided by controlling the
material amount fed into the elevator).
4.4 BREAK-IN PERIOD
The first 50 hours of operation are considered to be the break-in period.
NOTE: Before the compactor is shipped from the factory, Orkel has performed a thorough quality control and
made a test run. The test run is done without any material. The need of some adjustments during first start
up is to be expected, depending on the material being baled.
4.4.1 Precautions during the break-in period
When the compactor is brand new, there are a couple of things that need special attention from the oper-
ator. The tensioning of the elevator chain must be checked and, if necessary, readjusted during the first
three hours of operation.
4.4.2 After the first 50 hours of operation
Change the oil, and all oil filters.
4 OPERATION
43
Содержание Dens-X Compactor
Страница 14: ...1 6 DECLARATION OF CONFORMITY 1 GENERAL 14...
Страница 102: ...8 6 4 Gearbox and gears for hydraulic motors Gear oil Renolin unisyn CLP 220N 8 LUBRICATION 102...
Страница 103: ...8 7 MANUAL LUBRICATION CHARTS 8 7 1 The compactor 8 LUBRICATION 103...
Страница 104: ...8 7 2 Feed hopper F25 8 LUBRICATION 104...
Страница 105: ...8 7 3 Flexible drawbar 8 LUBRICATION 105...
Страница 109: ...10 1 MAIN POWER SUPPLY E STOP SWITCHES AND ELECTRICAL CABINET 10 ELECTRICS 109...
Страница 110: ...10 2 ELECTRICAL CABINET POWER SUPPLY RAIL 10 ELECTRICS 110...
Страница 111: ...10 3 SENSORS AND MANUAL CONTROLS 10 ELECTRICS 111...
Страница 112: ...10 4 VALVES FAN MOTORS AND PUMPS 10 ELECTRICS 112...
Страница 124: ...10 9 SENSOR OVERVIEW 10 ELECTRICS 124...
Страница 128: ...11 1 1 Complete diagram 11 HYDRAULICS 128...
Страница 129: ...11 1 2 Wrapping table chamber and elevator control 11 HYDRAULICS 129...
Страница 130: ...11 1 3 Plastic tying unit sub conveyor and feed hopper 11 HYDRAULICS 130...
Страница 131: ...11 1 4 Additional feed hopper control for F25 and chamber drive 11 HYDRAULICS 131...
Страница 133: ...11 2 VALVE OVERVIEW 11 2 1 Valve chart for Dens X 11 HYDRAULICS 133...
Страница 137: ...12 6 3 Dimensional sketch F25 operating mode 12 SPECIFICATIONS 137...
Страница 138: ...12 6 4 Dimensional sketch F25 transport mode 12 SPECIFICATIONS 138...
Страница 142: ...M Maintenance 13 69 71 INDEX 142...