
3.6.4 Remote control
The plastic tying unit may be operated from the platform using the remote control. Each button activates
a programmed sequence, including several functions running in order:
Open film system:
Press and hold red and blue buttons until the sequence is finished (knife and feed
rollers open).
Close film system:
Press and hold red and yellow buttons until the sequence is finished (feed rollers
and knife close).
Start net/film system
Press and hold green button for at least 2 seconds until the net/film
system starts
Release brake:
Press and hold red button and shortly tap blue button.
Engage brake:
Press and hold red button and shortly tap yellow button.
The brake will automatically release and engage when the opening and closing sequences are engaged.
NOTE: When the net/film system is started from the remote control, the machine will continue in auto mode
when the sequence is completed.
Figure 3.5 :
Plastic tying unit control
3.7 WRAPPING TABLE
3.7.1 Wrapping settings
Wrapping arms, high speed: Valve P1 regulates the oil flow to the wrapping arms. Turning it clockwise
increases the speed. Counterclockwise decreases the speed. Recommended wrapping arms speed is 27-28
rpm.
Perform adjustment as follows: Open valve P1 completely. Then close valve P1 gradually until the correct
speed is achieved. Check and reset the settings on the display unit in order to maintain the appropriate
wrapping belt rotation and hence wrap film overlap.
Wrapping arms, low speed: When the wrapping arms high speed is set, the low speed may be set using
valve P2. The low speed may not exceed 10 rpm.
3 SETTINGS AND HYDRAULIC ADJUSTMENTS
28
Содержание DENS-X
Страница 14: ...1 6 DECLARATION OF CONFORMITY 1 GENERAL 14 ...
Страница 98: ...8 6 4 Gearbox and gears for hydraulic motors Gear oil Renolin unisyn CLP 220N 8 LUBRICATION 98 ...
Страница 99: ...8 7 MANUAL LUBRICATION CHARTS 8 7 1 The compactor 8 LUBRICATION 99 ...
Страница 100: ...8 7 2 Feed hopper F10 8 LUBRICATION 100 ...
Страница 101: ...8 7 3 Telescopic drawbar 8 LUBRICATION 101 ...
Страница 105: ...10 1 MAIN POWER SUPPLY E STOP SWITCHES AND ELECTRICAL CABINET 10 ELECTRICS 105 ...
Страница 106: ...10 2 ELECTRICAL CABINET POWER SUPPLY RAIL 10 ELECTRICS 106 ...
Страница 107: ...10 3 SENSORS AND MANUAL CONTROLS 10 ELECTRICS 107 ...
Страница 108: ...10 4 VALVES FAN MOTORS AND PUMPS 10 ELECTRICS 108 ...
Страница 120: ...10 9 SENSOR OVERVIEW 10 ELECTRICS 120 ...
Страница 124: ...11 1 1 Complete diagram 11 HYDRAULICS 124 ...
Страница 125: ...11 1 2 Wrapping table chamber and elevator control 11 HYDRAULICS 125 ...
Страница 128: ...11 2 VALVE OVERVIEW 11 2 1 Valve chart for Hi X 11 HYDRAULICS 128 ...
Страница 132: ...12 6 3 Dimensional sketch F10 operating mode 12 SPECIFICATIONS 132 ...
Страница 133: ...12 6 4 Dimensional sketch F10 transport mode 12 SPECIFICATIONS 133 ...
Страница 137: ...M Maintenance 13 65 67 INDEX 137 ...