Recommended Tools
Tekelec tools should be labeled “Property of TEKELEC” with either a press-on Field Tool Identification
label or Field Tool Identification wrap.
• Safety glasses
• Power knife
• Cable cutters
• Cable stripper
• Flush cutters
• Crimping tool with embossing dies (test before using)
• Socket wrench set, 1/4-inch or 3/8-inch drive or open-end wrenches
• Non oxidizing grease
Note: It is a requirement that when mating dissimilar metals non oxidizing grease is used between
them as a corrosion inhibitor.
• Lacing cord and nylon cable ties
• Heat-shrink gun (hot air blower)
• Torque wrench
• Fiber paper
Procedure — Ground Frame
1. Install the continuous ground conductor to the Ground Window. Run the conductor the length of
the equipment lineup (see the figure System Frame Grounding).
The separate #6 American Wire Gauge (AWG) cable ground that runs to each frame will allow
removal of a frame from the lineup without interrupting the grounding of other frames in the
lineup.
2. Install the branch ground conductor to the frame ground cable (P/N 830-1354-01, Cable
Assy_6AWG_Frame Ground_GRN with YEL Stripe) pre-attached to the Frame Bus Bar. Use H-tap
to connect this cable to the branch ground conductor.
The continuous aisle ground conductor will be H-tapped to the branch (see the figure System Frame
Grounding). Torque screws to 45 inch-pounds.
62
910-5681-001 Revision E, February 2014
Cabinet Installation
Installation