Verify Operation of Slide Rails and CMA
Verify Operation of Slide Rails and CMA
Note -
Two people are recommended for this procedure, one to move the server in and out of
the rack, and one to observe the cables and CMA.
1.
Slowly pull the server out of the rack until the slide rails reach their stops.
2.
Inspect the attached cables for any binding or kinks.
3.
Verify that the CMA extends fully from the slide rails.
4.
Push the server back into the rack.
Installing the Server
47
Содержание SPARC T8-1
Страница 1: ...SPARC T8 1 Server Installation Guide Part No E80507 03 June 2019 ...
Страница 2: ......
Страница 8: ...8 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 24: ...24 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 49: ...Verify Operation of Slide Rails and CMA Secure Cables to the CMA on page 60 Installing the Server 49 ...
Страница 50: ...50 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 72: ...72 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 76: ...76 SPARC T8 1 Server Installation Guide June 2019 ...