Install the Server
Related Information
■
“Rack Compatibility” on page 30
■
■
“Installing the Rackmount Kit” on page 33
■
“Determine Correct Rackmount Hardware” on page 35
Install the Server
Caution -
Do not attempt to move the server alone without a lift. For a one-person installation,
all the main CRUs must be removed, and a lift must be used. For a two-person installation, all
the CRUs must be removed, and a lift is optional.
1.
Prior to installing the server, confirm that you have removed the following
components.
■
Both processor modules
■
The main module
■
All four power supplies
■
All five fan modules
Refer to the
SPARC T7-4 Server Service Manual
for removal instructions.
2.
If you are using a mechanical lift, ensure that the lift is level and stable.
3.
Lift the server up to the correct height.
Ensure that the bottom edge of the server has cleared the bottom of the shelf rails.
Installing the Server
39
Содержание SPARC T7-4
Страница 1: ...SPARC T7 4 Server Installation Guide Part No E54993 04 March 2017 ...
Страница 2: ......
Страница 8: ...8 SPARC T7 4 Server Installation Guide March 2017 ...
Страница 10: ...10 SPARC T7 4 Server Installation Guide March 2017 ...
Страница 22: ...22 SPARC T7 4 Server Installation Guide March 2017 ...
Страница 28: ...28 SPARC T7 4 Server Installation Guide March 2017 ...
Страница 64: ...64 SPARC T7 4 Server Installation Guide March 2017 ...
Страница 86: ...86 SPARC T7 4 Server Installation Guide March 2017 ...