
Prepare the Power Cords
Prepare the Power Cords
Prepare the power cords by routing them from the AC power source to the server.
Caution -
Do not attach power cables to the power supplies until you have connected the server
to a serial terminal or a terminal emulator (PC or workstation). The server goes into Standby
mode and Oracle ILOM on the SP initializes as soon as a power cable connects a power supply
to an external power source. System messages might be lost after 60 seconds if a terminal or
terminal emulator is not connected to the SER MGT port before power is applied.
Note -
Oracle ILOM signals a fault if both power supplies are not cabled at the same time, since
it will be a nonredundant condition. Do not be concerned with this fault in this situation.
1.
Route the power cords from the AC power source to the rear of the server.
Do not attach the power cords to the power supplies at this time.
2.
Connect a device to the SER MGT port.
66
SPARC T7-1 Server Installation Guide • October 2015
Содержание SPARC T7-1
Страница 1: ...SPARC T7 1 Server Installation Guide Part No E54979 01 October 2015 ...
Страница 2: ......
Страница 8: ...8 SPARC T7 1 Server Installation Guide October 2015 ...
Страница 20: ...20 SPARC T7 1 Server Installation Guide October 2015 ...
Страница 49: ...Verify Operation of Slide Rails and CMA Secure Cables to the CMA on page 62 Installing the Server 49 ...
Страница 50: ...50 SPARC T7 1 Server Installation Guide October 2015 ...
Страница 64: ...64 SPARC T7 1 Server Installation Guide October 2015 ...
Страница 84: ...84 SPARC T7 1 Server Installation Guide October 2015 ...