84
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
▼
Move Server Up or Down a Ramp
Caution –
A fully-configured, unpackaged server weighs nearly 3700 lbs (1678 kg).
Use six people to push the server up or down a ramp.
Create a metal ramp long enough to cross small changes in elevation and strong
enough to support the weight of the server.
Note –
The maximum allowable incline of an unpackaged server is 5 degrees (9%
grade). Design a ramp long enough to achieve this incline level and strong enough to
support the weight of the server. If you cannot achieve this 5 degree incline level,
consider an alternate route to the installation site.
1. Design a ramp that supports the weight of the server.
Consult with you facilities manager to design and create a ramp with the
following characteristics:
■
Strong enough to support the nearly 3700 lbs (1678 kg) weight of the server
over the entire span of the ramp.
■
Be at least 48-inches (1220 mm) wide, or as wide as the passageway.
■
Long enough to extend over the elevation and remain under the 5 degree (9%
grade) maximum incline.
■
Designed to ensure that the server does not fall over the sides of the ramp (for
example, add railings, stops, or bend the edges of the ramp upward 90
degrees).
Note –
If the ramp has railings, cover these railings with heavy fabric to avoid
scratching the surfaces of the server.
Caution –
Never use metal plates that contain tear drop or diamond patterns. These
patterns can cause the castors to spin and make the server to move off course.
Avoid using wooden ramps as they cannot support the weight of the server.
The castors can have difficulty rolling over ramps coated with sticky or rubberized
surfaces. Use additional people to push the server up or down ramps with these
surfaces.
2. Ensure that all four leveling feet on the bottom of the server are raised and out
of the way.
See
Содержание sparc M5-32
Страница 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Страница 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Страница 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Страница 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Страница 43: ...Preparing the Site 33 FIGURE 4 Wire Power Cord AC Plug 460P9W Figure Legend 1 L1 2 L2 3 L3 4 Ground ...
Страница 51: ...Preparing the Site 41 ...
Страница 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...