Install the Motherboard
■
“Preparing for Service” on page 43
■
“Returning a Server to Operation” on page 235
Install the Motherboard
Installing the motherboard is a cold-service operation. You must power off the server before
installing the motherboard.
1.
Position the motherboard for installation into the server.
The heatsinks are toward the front of the server, and the ports are at the rear.
2.
Lift the motherboard by the handles, and slowly lower the motherboard into the
chassis.
Caution -
Take care when using the handles to install the motherboard. These handles are not in
weight-balanced locations. Avoid flexing the motherboard.
Caution -
Take care to clear the four screws at the rear of the chassis. The screws are long and
might scratch or damage the motherboard.
Servicing the Motherboard
231
Содержание Netra SPARC S7-2
Страница 1: ...Netra SPARC S7 2 Server Service Manual Part No E73207 03 February 2017 ...
Страница 2: ......
Страница 12: ...12 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 24: ...24 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 42: ...Server Fault Remind Button Operation 42 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 84: ...84 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 108: ...108 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 140: ...140 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 150: ...150 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 158: ...158 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 192: ...192 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 216: ...216 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 258: ...258 Netra SPARC S7 2 Server Service Manual February 2017 ...