
Installing the Fabric Interconnect F1-15 in a 4-Post Rack
FIGURE 4
Unpacking Shipping Containers and Examining Contents
Note -
Although not pictured, a cable management assembly (CMA) is included in a separate
box.
3.
Unpack the Fabric Interconnect chassis and place it on a flat, stable surface
capable of supporting up to 55 pounds (25 kilograms).
Installing the Fabric Interconnect F1-15 in a 4-Post Rack
This section documents how to install the Fabric Interconnect F1-15 in a 4-post equipment rack.
The procedure in this section documents installing a Fabric Interconnect F1-15 by using the
standard rail kit that comes with the Fabric Interconnect. The rail kit is useful as a “rack helper”
to temporarily hold the chassis in place in the rack while attaching rack-mount hardware,
20
Oracle Fabric Interconnect Hardware User's Guide • July 2016
Содержание Fabric Interconnect F1-15
Страница 1: ...Oracle Fabric Interconnect Hardware User s Guide Part No E50997 04 July 2016...
Страница 2: ......
Страница 8: ...Contents Index 173 8 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Страница 10: ...10 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Страница 94: ...94 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Страница 168: ...168 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Страница 172: ...172 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Страница 176: ...176 Oracle Fabric Interconnect Hardware User s Guide July 2016...