Install the Motherboard Assembly
5.
Reconnect the auxiliary signal cable to the motherboard from the front storage
drive backplane [5].
“Servicing the Storage Drive Backplanes” on page 112
.
6.
Reconnect the ribbon cables from left and right LED/USB indicator modules to
the motherboard [6].
“Servicing the Front LED/USB Indicator Modules” on page 130
7.
Reconnect the power cable to the motherboard from the front storage drive
backplane [6].
Servicing Components That Require Server Power-Off
157
Содержание EXADATA X5-2
Страница 1: ...Oracle Exadata Storage Server X5 2 High Capacity Service Manual Part No E55080 05 January 2018 ...
Страница 2: ......
Страница 12: ...12 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Страница 20: ...20 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Страница 160: ...160 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Страница 176: ...176 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Страница 202: ...202 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Страница 228: ...228 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...