30
-
3.3 Electrical Installation
The delivered glass system is already
pre-wired and is ready for operation
without
any
additional
electrical
installation.
To integrate the input signal from the
furnace with the glass inspection
system, you must open the control
cabinet. On the left side is a terminal
block, which is connected to different
colors of wires. These are labeled as
follows (
).
Figure 11:
Control cabinet open
Содержание Top-down GIS
Страница 1: ...Operators Manual Top down GIS Glass Inspection System ...
Страница 5: ... Table of contents 5 Appendix A Control cabinet 43 ...
Страница 11: ... Technical Data 11 Figure 1 Dimensions mm shutter system ...
Страница 12: ... 12 Figure 2 Dimensions mm switch cabinet ...
Страница 19: ... Technical Data 19 CT G5L SF optics ...
Страница 34: ... 34 Figure 16 Linescan in PIX Connect software ...
Страница 43: ... Appendix A Control cabinet 43 Appendix A Control cabinet Figure 24 Wiring diagram of control cabinet ...
Страница 48: ...Top down GIS MA E2021 07 A ...