5.4.11 Play adjustment of the guide in the X axis
By adjusting the V-ledge to the left and/or right.
Dismantle the horizontal table.
Open the left and right bearing covers.
Perform measurement on the left:
If possible, use a dial gauge with drag pointer.
Fix dial gauge as shown.
Press the vertical milling table down on the left side and release.
Read the dial gauge.
Press the vertical milling table up on the left side and release.
Read the dial gauge, the total deviation must be less than 0.01mm.
In the event of a larger deviation, push the V-ledge with the adjusting screw slightly.
Perform measurement on the right:
Position the dial gauge on the right side and proceed using the same method.
Abb.5-9: Adjust guide, X axis
X
Y
Z
Dial gauge
Vertical milling table
V-ledge
Adjustment screw
Machine stand
Содержание OPTImill MZ 25
Страница 1: ...GB Operating Manual Version 1 0 4 Milling machine Part no 3346235...
Страница 72: ...Ersatzteile Spare parts 72 DE GB milling parts preface_DE GB fm...
Страница 101: ...Version 1 0 4 2020 9 8 101 Originalbetriebsanleitung MZ2S DE EN MZ2S_parts fm 6 29 Schaltplan Wiring diagram 1 3...
Страница 102: ...Version 1 0 4 2020 9 8 102 Originalbetriebsanleitung MZ2S DE EN MZ2S_parts fm 6 30 Schaltplan Wiring diagram 2 3...
Страница 103: ...Version 1 0 4 2020 9 8 103 Originalbetriebsanleitung MZ2S DE EN MZ2S_parts fm 6 31 Schaltplan Wiring diagram 3 3...
Страница 122: ...Version 1 0 4 2020 09 08 122 Translation of original instructions MZ2S EN MZ2S_GBSIX fm...