Operation
Version 1.0.4 - 2020-09-08
46
Translation of original instructions
MZ2S
EN
MZ
2S
_G
B_4.
fm
4.17
Adjusting spindle guard
When drilling, adjust the spindle guard to
the appropriate height with the spindle
sleeve lever.
When milling with closed protective
housing, the spindle guard can be set to its
top position.
INFORMATION
The spindle rotation is only released
when the spindle guard is closed.
4.18
Conversion to horizontal milling
Spindle sleeve lever
Close spindle guard
Содержание OPTImill MZ 25
Страница 1: ...GB Operating Manual Version 1 0 4 Milling machine Part no 3346235...
Страница 72: ...Ersatzteile Spare parts 72 DE GB milling parts preface_DE GB fm...
Страница 101: ...Version 1 0 4 2020 9 8 101 Originalbetriebsanleitung MZ2S DE EN MZ2S_parts fm 6 29 Schaltplan Wiring diagram 1 3...
Страница 102: ...Version 1 0 4 2020 9 8 102 Originalbetriebsanleitung MZ2S DE EN MZ2S_parts fm 6 30 Schaltplan Wiring diagram 2 3...
Страница 103: ...Version 1 0 4 2020 9 8 103 Originalbetriebsanleitung MZ2S DE EN MZ2S_parts fm 6 31 Schaltplan Wiring diagram 3 3...
Страница 122: ...Version 1 0 4 2020 09 08 122 Translation of original instructions MZ2S EN MZ2S_GBSIX fm...