C200
S
OFTWARE
Instruction Manual C200 Part2 A1.doc
optek Danulat GmbH
•
D-45356 Essen
•
Germany
page 94
6.2.2 Preparation
a) Switch off the supply and disconnect the conductivity cell(s), temperature compensator(s) and current output(s) from
the analyzer's terminal blocks.
b) Sensor A
1) Link terminals B9 and B10.
2) Connect one terminal of the 0 to 100k
Ω
decade resistance box to B13 and B14 and the other terminal to B15 and
B16 to simulate the conductivity cell. Connect the decade resistance box earth to B12.
3) Connect the 0 to 10k
Ω
decade resistance box to B9 and B11 to simulate the Pt1000/3K Balco.
Sensor B (dual input analyzers only)
1) Link terminals B1 and B2.
2) Connect one terminal of the 0 to 100k
Ω
decade resistance box to B5 and B6 and the other terminal to B7 and B8
to simulate the conductivity cell. Connect the decade resistance box earth to B4.
3) Connect the 0 to 10k
Ω
decade resistance box to B1 and B3 to simulate the Pt1000/3K Balco.
c) Connect the milliammeter to the analog output terminals.
d) Switch on the supply and allow ten minutes for the circuits to stabilize.
d) Select the FACTORY SETTINGS page and carry out Section 7.2.3.
Terminal link
Conductivity
Cell Simulator
Temperature
Simulator
Earth
B10
B11 B12
B13
B14
B9
Sensor A Terminal Numbers
Sensor B Terminal Numbers
B2
B3
B4
B5
B6
B1
B7
B8
B15
B16
Содержание CONTROL 200
Страница 95: ...C200 SOFTWARE Instruction Manual C200 Part2 A1 doc optek Danulat GmbH D 45356 Essen Germany page 73 ...
Страница 128: ...C200 SOFTWARE Instruction Manual C200 Part2 A1 doc optek Danulat GmbH D 45356 Essen Germany page 106 ...
Страница 130: ...C200 SOFTWARE Instruction Manual C200 Part2 A1 doc optek Danulat GmbH D 45356 Essen Germany page 108 8 3 PID Controller ...
Страница 131: ...C200 SOFTWARE Instruction Manual C200 Part2 A1 doc optek Danulat GmbH D 45356 Essen Germany page 109 ...
Страница 133: ...C200 SOFTWARE Instruction Manual C200 Part2 A1 doc optek Danulat GmbH D 45356 Essen Germany page 111 ...