Commissioning
- 28 -
optek-Manual--1004-1022-02--156-US-2017-12-11
9
Commissioning
9.1
Requirements for commissioning
Before commissioning the converter or the whole measuring system, carry out
the following activities:
• Install the armature (see instruction manual of armature).
• Check the pipeline with the armature for leaks.
• Check armature windows. They must not be dirty.
• Install the sensor (see instruction manual of the sensor).
• Ensure that the converter is mounted correctly (see chapter 7, page 17).
• Verify correct wiring of the converter (see chapter 8, page 19).
9.2
Switching the converter on
1. Flip the converter power switch (22) to I (ON) position.
Fig. 19
Power switch on converter 115 / 230 V (left) and 24 V (right)
2. Switch on the external release device.
3. Wait for approx. 15 minutes, until the system has reached the operating
temperature.
ALARM II
14
OPTEK-DANULAT
MADE IN GERMANY
N
PE
L
LAMP
AL
17
18
15
16
1
2
5
5
4
5
3
DETECT
ORINPUTS
8
!
24V DC
50/60Hz, 30VA
24V, T1,25A
ALARM I
11
12
13
9
10
mA
VOLTAGE
6
7
LAMP
LAMP -
21
20
19
ALARM II
14
MADE IN GERMANY
OPTEK-DANULAT
N
PE
L
230V
LAMP
AL
17
18
15
16
3
DETECT
ORINPUTS
5
5
4
50/60Hz, 30VA
230VAC, T0,315A
115VAC, T0,630A
115/230V !
5
1
2
8
ALARM I
11
13
12
10
9
mA
VOLTAGE
6
7
LAMP
LAMP -
21
20
19
22