Setup and Operation
Chapter 2
Setup and Operation
2.1
Unpacking the equipment
The IBP-YAG has been carefully packed for shipment. If the container arrives damaged in any way,
please contact the shipper. Inspect each item as it is unpacked, looking for dents, scratches or other
damage. If damage is evident , immediately file a claim against the carrier and notify Spiricon.
2.1.1
Optional Cart system
If ordered, the cart system will be shipped separately and will include separate unpacking and setup
instructions.
2.2
Setting up the IBP-YAG
2.2.1
Frame Grabber and Software Setup
The IBP-YAG operates in conjunction with Spiricon’s LBA-PC software program and LBA-7xx frame
grabber. If the IBP-YAG was ordered with a computer system, the software and frame grabber card will
already be installed in the computer. If you are installing the frame grabber yourself, please refer to the
LBA-PC Operator’s Manual for instructions.
2.2.2
Connections
Figure
2-1
IBP-YAG
2-1