background image

HOBO® MicroRX Station (RX210x) Quick Start

 

23807-B MAN-RX2100-QSG 

Tools required: 

 

Phillips-head screwdriver for installing the water level sensor 
(RX2103 and RX2104 models) or mounting the station to a flat 
surface with screws. 

 

A ½ inch box wrench if you are using U-bolts to mount the station 
to a tripod or mast. 

 

Other tools may be required depending on the accessories you 
are using for your station deployment.

 

1

 

Log in to HOBOlink. 

Go to www.hobolink.com and log in to an existing account or 
create a new one. You’ll receive an email to activate the account. 

2

 

Register the station.

 

In HOBOlink, click Devices, then RX Devices. Click the Register a 
Device link. Give the station a name and enter the serial number 
and device key from the label inside the station door. 

Note:

 If you are using your own micro SIM card, follow the 

instructions at www.onsetcomp.com/support/ 
manuals/23845-installing-micro-sim-rx2100-station before 
continuing. 

Mount the station. 

There are three ways to mount the station using the built-in 
mounting tabs. 

Note:

 You can also defer mounting until the end 

of the process if you want to perform initial testing. 

 

Use the two sets of outer 
holes and 1-5/8 inch saddle-
clamp U-bolts to attach the 
logger to a tripod or mast 
(this is the recommended 
method for mounting on a 
mast). Do not use U-bolts 
without the saddle clamps 
as that could bend the 
mounting tabs and damage 
the housing or compromise 
the weatherproof seal. The 
flat portion of the saddle 
clamps should be against 
the mounting tabs. 

 

Use the included cable ties  
with the two sets of inner  
holes to affix the logger to a PVC pipe or mast. 

 

Use the included screws and washers with the two sets of 
outer holes to adhere the logger to a wall or flat surface. 

Important:

 See the RX2100 manual for additional deployment 

guidelines at www.onsetcomp.com/support/manuals/23808-
rx2100-manual. 

4

 

Remove the cable channel. 

Remove the cable 
channel making note 
of how it is oriented. 

Install the water level sensor if applicable 
(RX2103 and RX2104 models). 

a.

 

Insert the water level 
sensor cable jack into the 
water level sensor. Screw 
on locking nut (hand tight). 

 

Important: 

Make sure the O-rings on the cable jack end and 

the cable and sensor mating housing surfaces are clear of any 
debris. Any contamination of these surfaces can cause leaks 
that may lead to sensor failure. 

b.

 

Plug the other end of the water level sensor cable into the port 
on the right side of the board. 

 

c.

 

Use a Phillips head screwdriver to secure the water level sensor 
cable in place with the two screws provided. 

d.

 

Route the cable through the far-right hole in the cable channel. 

6

 

Plug in smart sensors if applicable. 

a.

 

Plug in smart sensors into the ports below the LCD. 

 

b.

 

Route the cables through the holes in the cable channel. There 
are slits in the cable channel above each hole to guide the 
cable into the hole. You may need to slightly bend the ends of 
the channel to reveal the slits and push each cable into the 
hole that lines up with the corresponding sensor connector. 

Grease and reinstall the cable channel. 

a.

 

Use the integrated plugs to fill any unused holes. Bend the 
plugs up to push them into the holes. Once a plug is partially 
pushed through, you can pull on the part of the plug that is 
inside the case. You may need to bend the ends of the channel 
slightly to widen the holes for installing the plugs. 

b.

 

Lightly coat the portion of the sensor cables that will be in the 
cable channel with a small amount of silicone grease (about the 
size of a pea). 

c.

 

Lightly coat the bottom and two sides of the cable channel with 
silicone grease. 

d.

 

Reinstall the cable channel in the station making sure the key 
on the bottom is inserted in the notch in the station enclosure 
as pointed out in step 4.

 

 

Inner mounting holes; use 
with cable ties

Outer mounting 
holes; use with 
screws and washers 
or saddle-clamp  
U-bolts 

Inner mounting holes; use with 
cable ties 

Secure the cable 
with two screws 

Plug the water 
level sensor 
cable into this 
port 

Plug in smart sensors into 
the five ports 

Notch where the key on the 
bottom of the cable channel 
is installed 

Cable channel 