1500 North Belcher Road, Clearwater, FL 33765 • Tel (727) 447-6140 • Fax (727) 442-5699 • [email protected]
Turbine Flow Meter Manual 05/13 - 0721-1 / 13518
Page 25
4.5 INLINE METER START-UP AND COMMISSIONING WORKSHEET
Please read all installation instructions carefully prior to proceeding with these steps. Wiring
diagrams are located in the appendix. Use the following worksheet for checking off the
commissioning steps and recording measured values:
STEP
TEST / MEASUREMENT
S/N: _______ S/N: _______ S/N: _______ S/N: ______
1
Meter location
2
Control system programming
3
Match display or BTU meter serial#
(if ordered)
4
Signal connections verified
5
Supply voltage verified
6
Connect power
The following steps require flow in the pipe. Flow signal readings should be taken while holding the flow rate con-
stant if possible; otherwise, take the various output readings as quickly as possible.
7
Frequency output(s):
Avg = green, Top = white
Bottom = orange
Avg Freq. (HZ):
Avg Freq. (VDC):
Hz
VDC
Hz
VDC
Hz
VDC
Hz
VDC
Calculated Flow Rate: GPM GPM GPM GPM
8
Analog or digital outputs
4-20 mA signal:
0-10 V signal:
MA
VDC
MA
VDC
MA
VDC
MA
VDC
Scaled output time interval or
divided output frequency
Calculated Flow Rate: GPM GPM GPM GPM
9
Flow rate displayed by control
system GPM GPM GPM GPM