• Insert screws through the bracket into the mounting surface.
Note that these screws are not in the scope of delivery.
• Tighten all four screws with a torque of 0.5 N·m.
The Box PC is mounted.
5-3-9
Wall Mount Procedure
Use the following procedure to mount the Box PC in the wall orientation.
Additional Information
• Refer to
on page 5 - 27 for grounding details.
• Refer to
on page 2 - 17 for the bracket model.
To mount the Box PC:
1
Mount the Brackets
A
to the Industrial Box PC
C
with the 6 Phillips screws
B
supplied with
the brackets.
Tighten these screws with a torque of 0.5 N·m.
A
B
C
0
15
2
Mount the Industrial Box PC with the brackets in position.
• Drill the four holes at the location where the Box PC with brackets will be mounted.
• Position the Industrial Box PC with bracket in the mounting location.
• Insert screws through the bracket into the mounting surface.
Note that these screws are not in the scope of delivery.
• Tighten all four screws with a torque of 0.5 N·m.
The Box PC is mounted.
5 Installation
5 - 26
NY-series Industrial Box PC User's Manual (W553)
Содержание NYB17-11
Страница 30: ...Sections in this Manual 28 NY series Industrial Box PC User s Manual W553...
Страница 38: ...1 Overview 1 8 NY series Industrial Box PC User s Manual W553...
Страница 60: ...2 Hardware 2 22 NY series Industrial Box PC User s Manual W553...
Страница 218: ...7 Maintenance 7 42 NY series Industrial Box PC User s Manual W553...
Страница 239: ...I Index I 1 NY series Industrial Box PC User s Manual W553 I...
Страница 242: ......
Страница 243: ......