4-6
Initial Power ON
This section describes how to Power ON the Industrial Panel PC for the first time.
WARNING
Ensure that installation and post-installation checks of the product are performed by
personnel in charge who possess a thorough understanding of the machinery to be
installed.
4-6-1
Initial Power ON Procedure
Use the following procedure to power ON the Industrial Panel PC for the first time.
1
Ensure the following conditions are present before applying power for the first time:
• The Panel PC is securely fastened to the mounting surface.
• The Panel PC is connected to ground.
• All connectors are securely fastened.
2
Connect an optional keyboard and/or mouse.
Additional Information
• If using an OMRON Industrial Panel PC, this may not be required because it has touch func-
tionality.
• Do not connect additional storage devices before the installation of the operating system
completed. Adding storage devices like a USB flash drive, an SD memory card or a PCIe
card might influence the default drive letter sequence.
3
Ensure the power supply is ON.
Precautions for Safe Use
Always check the power supply and power connections before applying power. Incorrect power
connections can damage the product or cause burning.
4
Press the power button and release within 1 second.
The Panel PC starts and the PWR LED will go ON.
Additional Information
• If a Windows operating system is preinstalled:
• the Windows configuration will automatically start
• refer to
4-6-2 Windows Startup First Time
on page 4-15 for details
5
Verify the ERR LED is OFF.
The Panel PC is ON and if an operating system is installed it will start.
4 Installation
4-13
NY-series NYE Industrial Panel PC Conversion Guideline for NS-series products (P157)
4-6
Initial Power ON
4
4-6-1
Initial Power ON Procedure
Содержание NY Series
Страница 4: ...Introduction 2 NY series NYE Industrial Panel PC Conversion Guideline for NS series products P157...
Страница 24: ...Revision History 22 NY series NYE Industrial Panel PC Conversion Guideline for NS series products P157...
Страница 30: ...1 Overview 1 6 NY series NYE Industrial Panel PC Conversion Guideline for NS series products P157...
Страница 40: ...2 Hardware 2 10 NY series NYE Industrial Panel PC Conversion Guideline for NS series products P157...
Страница 54: ...3 Specifications 3 14 NY series NYE Industrial Panel PC Conversion Guideline for NS series products P157...
Страница 72: ...4 Installation 4 18 NY series NYE Industrial Panel PC Conversion Guideline for NS series products P157...
Страница 94: ...5 Conversion Procedures 5 22 NY series NYE Industrial Panel PC Conversion Guideline for NS series products P157...
Страница 95: ...I Index I 1 NY series NYE Industrial Panel PC Conversion Guideline for NS series products P157 I...
Страница 98: ...Index I 4 NY series NYE Industrial Panel PC Conversion Guideline for NS series products P157...
Страница 99: ......