1-4
Commissioning Procedures
1-4-1
Overall Procedure
Use the following procedure to build a safety system.
The procedure is divided into steps for standard control and safety control.
Standard Control
Safety Control
Step 1. System Design
Step 1-1 Determining Safety Measures by Performing Risk Assessment
Step 2. Software Design
Step 2. Hardware Design
Step 2-1 Designing I/O and Processing
Step 2-2 Designing Safety Programs
Step 3 Calculating and Verifying Safety Response Performance
Step 3-1 Calculating Safety Reaction Time and Safety Distance
Step 3-2 Verifying Fulfillment of Required Specifications
Step 4. Software Settings and Programming
Step 4-1 Creating the Safety Control System Configuration
Step 4-3 Assigning Safety I/O Terminals to the Connected Devices
Step 4-4 Assigning Device Variables to I/O Ports
Step 4-5 Programming
Step 5. Installation and Wiring
Step 6. Checking Operation
Step 6-1 Changing to DEBUG Mode After Transferring the Slave Terminal Configuration Information
Step 6-2 Checking Operation Using the Controller
Step 6-3 Performing Safety Validation Testing
Step 6-5 Validating Safety from the Sysmac Studio (Transferring the Program to the
Non-volatile Memory)
Step 7. Operation, Maintenance, and Inspection
Software Design
Designing I/O and Processing
Designing Tasks
Designing User Program
Software Settings and Programming
Slave and Unit Configurations
Controller Setup and Assignment of Device
Variables to I/O Ports
Programming
Offline Debugging
Transferring the Project
(Including Slave Terminal Configuration Information)
Online Debugging
Step 1-3 Designing the Interface between Standard Controls and Safety Controls
Step 1-2 Selecting Safety Devices
Checking Operation
Step 7-3 Inspection and Replacement
Step 7-1 Operation
Step 7-2 Troubleshooting Errors If They Occur
Step 2-1 Determining Wiring for
Communications, Power Supply,
and External I/O Devices
Step 4-2 Setting Up and Checking the Safety Process Data Communications
Step 4-6 Offline Debugging
Step 5-1 Installation
Step 5-3 Wiring the I/O
Step 5-4 Connecting the Computer That Runs the Sysmac Studio
Step 5-2 Connecting the Ethernet Cables
Step 6-4 Designing Device Security
1 Overview
1 - 15
NX-series Safety Control Unit User's Manual (Z930)
1-4 Commissioning Procedures
1
1-4-1
Overall Procedure
Содержание NX-SIH400
Страница 4: ...Introduction 2 NX series Safety Control Unit User s Manual Z930 ...
Страница 46: ...Revision History 44 NX series Safety Control Unit User s Manual Z930 ...
Страница 108: ...2 Specifications 2 42 NX series Safety Control Unit User s Manual Z930 ...
Страница 132: ...3 Installation and Wiring 3 24 NX series Safety Control Unit User s Manual Z930 ...
Страница 148: ...4 Safety Control Unit Operation 4 16 NX series Safety Control Unit User s Manual Z930 ...
Страница 216: ...5 System Configuration and Setup 5 44 NX series Safety Control Unit User s Manual Z930 ...
Страница 306: ...6 Programming 6 90 NX series Safety Control Unit User s Manual Z930 ...
Страница 378: ...7 Checking Operation and Actual Operation 7 72 NX series Safety Control Unit User s Manual Z930 ...
Страница 390: ...8 Calculating Safety Reaction Times 8 12 NX series Safety Control Unit User s Manual Z930 ...
Страница 412: ...11 Safety Data Logging 11 10 NX series Safety Control Unit User s Manual Z930 ...
Страница 504: ...12 Troubleshooting 12 92 NX series Safety Control Unit User s Manual Z930 ...
Страница 550: ...l Safety I O Terminal Settings l I O Map Settings Appendices A 38 NX series Safety Control Unit User s Manual Z930 ...
Страница 554: ...l I O Map Settings Appendices A 42 NX series Safety Control Unit User s Manual Z930 ...
Страница 558: ...l Safety I O Terminal Settings l I O Map Settings Appendices A 46 NX series Safety Control Unit User s Manual Z930 ...
Страница 564: ...l Safety I O Terminal Settings l I O Map Settings Appendices A 52 NX series Safety Control Unit User s Manual Z930 ...
Страница 623: ...I Index I 1 NX series Safety Control Unit User s Manual Z930 I ...
Страница 625: ......