![Omron LD Platform Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/omron/ld-platform/ld-platform_user-manual_743974027.webp)
Chapter 3: Setup
3.2 Before Unpacking
Carefully inspect all shipping containers for evidence of damage during transit. If any damage
is indicated, request that the carrier’s agent be present at the time the container is unpacked.
3.3 Unpacking
Before signing the carrier’s delivery sheet, compare the actual items received (not just the pack-
ing slip) with your equipment purchase order. Verify that all items are present and that the
shipment is correct and free of visible damage.
l
If the items received do not match the packing slip, or are damaged, do not sign the
receipt.
l
If the items received do not match your order, please contact your local Omron Support
immediately.
Retain the containers and packaging materials. These items may be necessary to settle claims
or, at a later date, to relocate the equipment.
Battery
The battery ships in a separate container, not inside the platform. The battery box measures
311 x 540 x 457 mm (12.25 x 21.25 x 18 inches). Locate the cardboard carton that contains the
battery before continuing. Refer to the following figure.
Figure 3-1. Battery Shipping Carton
Remove the battery from the carton. The battery has recessed hand grips at the ends of the bat-
tery, for lifting.
11970-000 Rev H1
LD Platform OEM User's Guide
27
Содержание LD Platform
Страница 1: ...I611 E 02 LD Platform User s Guide...
Страница 8: ......
Страница 37: ...Chapter 3 Setup Figure 3 15 E Stop Jumper on LD Platform Core 11970 000 Rev H1 LD Platform OEM User s Guide 37...
Страница 44: ......
Страница 70: ...70 LD Platform OEM User s Guide 11970 000 Rev H1 6 2 Payload Bay Connections Figure 6 7 E Stop Chain Diagram...
Страница 98: ......
Страница 130: ......
Страница 139: ......