
209
Troubleshooting Flowcharts
Section 9-5
Power Supply Check
PWR indicator not lit.
Replace the CPU
Unit.
Is power being
supplied?
Is voltage adequate?
Are there any discon-
nected connectors or
broken wires?
Connect power
supply.
Is PWR indicator lit?
Set supply voltage
within acceptable limits.
Is PWR indicator lit?
Connect connectors
or replace wires.
End
Yes
No
No
Yes
Yes
No
No
No
Is PWR indicator lit?
Yes
No
Yes
Yes
Содержание CPM2C-S100C
Страница 2: ......
Страница 3: ...CPM2C S Programmable Controller Operation Manual Revised September 2009 ...
Страница 4: ...iv ...
Страница 6: ...vi ...
Страница 10: ......
Страница 14: ...xiv ...
Страница 180: ...158 One to one PC Link I O Response Time Section 7 4 ...
Страница 222: ...200 Programming Example Section 8 3 ...
Страница 250: ......
Страница 256: ......
Страница 258: ......
Страница 260: ...238 Support Software Appendix C ...
Страница 268: ......