20
Startup Procedure
Section 1-4
Connector Assembly
XS2R-D427-5 T-joint
SRS2-1 Shield Terminator Plug (male)
SRS1-T Terminal-block Terminator
1-4
Startup Procedure
The standard procedure for starting up the CompoBus/S System is as follows:
Selecting Master and
Slave
Select the Master and Slaves according to the following items.
• PLC model being used (Refer to
and
4 Master Unit Specifications and Operations
• Number of Slaves (Refer to
• Maximum I/O points (Refer to
)
and
Determining the
Communications Mode
Determine the communications mode according to the following items.
• Communications distance (Refer to
• I/O response time (Refer to
2-5 I/O Response Time Characteristics
Determining System
Configuration
Determine the CompoBus/S System configuration according to the following
items. Select the devices required for connection (such as connectors, termi-
nal blocks, and terminators) according to the system configuration.
Socket (Female)
(Crimp terminals/Solder terminals)
XS2C-D4S7 (Communications)
XS2C-D4
((
(Power supply and I/O)
Plug (Male)
(Crimp terminals/Solder terminals)
XS2G-D4S7 (Communications)
XS2G-D4
((
(Power supply and I/O)
Plug (male)
Socket (female)
Socket (female)
Socket (female)
Plug (male)
Plug (male)
Mounting Holes
Two, 4.2 dia. or M4
40
20
21
20
30
±
0.2