56
Basic Procedures
Section 5-1
5-1
Basic Procedures
5-1-1
Outline of Board Control
In addition to reading from and writing to the Shared memory, these functions
are used to control the CompoNet Master Board:
5-1-2
Control of the Interrupt from PC to Board
Here is the procedure for the user application to interrupt the CompoNet
Master Board.
Function
Description
Interrupt
(PCI interrupt)
It is used for these processes:
[Interrupt by the PC to the Board]
•
Notify an Event transmission
•
Acknowledge (ACK) the Event transmission from the
Board.
•
Notify a command transmission
•
Request to get an access right to I/O area
•
Notify a release of the access right to I/O area
•
Refresh the PC WDT
[Interrupt by the Board to the PC]
•
Notify an Event transmission
•
Acknowledge (ACK) the Event transmission from the PC
•
Notify the command acknowledgment
•
Request to reset the Board
•
Notify the completion of Board initialization
•
Notify the completion of getting an access right to I/O area
•
Notify the WDT time-out
Command
(to the Board)
It is used for these processes:
•
Start the communications cycle
•
Start the communications cycle in the detailed setting
•
Start or stop the I/O communications
•
Stop the communications cycle
•
Request to read the detailed status group
•
Clear the detailed status group
Step
Operation procedure
Access to Shared Memory
1.
Set the interrupt cause.
(Generate an interrupt.)
In the Interrupt Trigger register (0x0002), set a flag of
interrupt cause to have into 1.
2.
Confirm the completion of
interrupt process.
(Confirm the Board
completes the interrupt
process.)
In the Interrupt Request Confirmation register (0x0003),
confirm that the interrupt cause flag which was set to 1 in
Step 1 turns to 0. (It remains 1 during interrupt but turns
to 0 when the interrupt completes.)
Содержание 3G8F7-CRM21
Страница 4: ...iv...
Страница 10: ...x TABLE OF CONTENTS...
Страница 30: ...10 Specifications Section 1 7 1 7 3 Dimensions 3G8F7 CRM21 PCI unit mm 3G8F8 CRM21 CompactPCI unit mm...
Страница 46: ...26 Connecting the Communications Power Supply Cables Section 2 4...
Страница 74: ...54 Board Hardware Error Notification Section 4 8...
Страница 173: ...153 APPENDIX D Sample Program D 1 Sample Program 154...
Страница 230: ...210 Wiring for Power Supply Section E 5...
Страница 234: ...214 Index...
Страница 236: ...216 Revision History...
Страница 237: ......