11. Initial Setup
16 www.sinetech.co.za
11. Initial Setup
Before inverter operation, set up “Operation Mode” via software. Follow the steps below very
closely. For more details, please check software manual.
Step 1:
After turning on the inverter and installing the software, please click “Open Monitor”
to enter main screen of this software.
Step 2:
Log into software first by entering default password “administrator”.
Step 3:
Select Device Control >> MyPower Management. This is where you set up inverter
operation mode and personalized interface. Refer to diagram below.
Modes
There are three operating modes: Grid-tie with backup, Grid-Tie and Off-Grid.
Grid-tie with backup: PV power can feed back to grid, provide power to the load
and charge battery. There are four options available in this mode: Grid-tie with
backup I, II, III, IV and V. In this mode, users can configure
PV power supply
priority, charging source priority and load supply source priority.
However,
when Grid-tie with backup IV option is selected in PV energy supply priority, the