![Omicron Lab SPECTANO 100 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/omicron-lab/spectano-100/spectano-100_user-manual_3978180027.webp)
26
SPECTANO 100 User Manual
9.2
Power up SPECTANO 100
DANGER
To power up
SPECTANO 100
by using the delivered AC power supply:
1. Plug the DC output connector of the AC power supply into the DC power input on the
SPECTANO 100
rear panel (see Figure 6-2 "SPECTANO 100 rear view").
2. Connect the AC power supply with the power cable.
3. Plug the mains plug of the power cable into the power outlet.
4. Press the I/0 power switch on the
SPECTANO 100
rear panel.
9.3
Connect
SPECTANO 100
to the computer
SPECTANO 100
communicates with the computer through USB interface (see chapter 4 "PC
requirements"). To connect
SPECTANO 100
to the computer:
1. Connect the USB 2.0 or higher cable to the USB connector on the
SPECTANO 100
rear panel.
2. Connect the USB cable to the USB connector of your computer by using the delivered USB 2.0
cable.
Death or severe injury caused by high voltage or current
►
Use only the delivered accessories and cables to ensure the safety
standard of
SPECTANO 100
.
►
Read the safety instructions in chapter 2 "Safety instructions" in this User
Manual before powering up
SPECTANO 100
.
►
Before powering up
SPECTANO 100
, ensure that
►
a solid connection of at least 6 mm
2
cross-section and not longer than
20 meters is connected between its equipotential ground and any
ground connection in the laboratory.
►
the whole test system is grounded properly.
►
only the delivered grounded AC power supply
DRA Supply
is
connected.
►
the test object is connected correctly.