Measurement Setup
3.5
Additional Wiring for Burden Measurement
Burden measurement may be performed separately or in conjunction with CT
testing and/or primary winding resistance measurement.
The following wiring is required for burden measurement (in addition to the basic
measurement setup shown in Figure 3-2 and Figure 3-3 and/or the additional
wiring for primary winding resistance measurement shown in Figure 3-5, as
required).
Figure 3-4
Additional wiring required for burden measurement
X1
X2
X3
X4
X5
X6
*
*
Burden
Basic CT wiring,
see Figure 3-2 or Figure 3-3
CT
*
For information how to connect the communication link between the
CT SB2
and the
CT Analyzer
, please refer to section 3.2 on page 20.
Содержание CT Analyzer
Страница 1: ...CT Analyzer CT SB2 User Manual...
Страница 3: ...CT Analyzer User Manual...
Страница 4: ...CT Analyzer User Manual 2 Manual Version CTAnalyzerUM AE 3...
Страница 39: ...37 Setup and Connection Figure 2 15 Measurement setup for delta compensation Ratio 1 L2 L3 L1...
Страница 50: ...CT Analyzer User Manual 48...
Страница 60: ...CT Analyzer User Manual 58...
Страница 80: ...CT Analyzer User Manual 78...
Страница 162: ...CT Analyzer User Manual 160...
Страница 172: ...CT Analyzer User Manual 170...
Страница 188: ...CT Analyzer User Manual 186...
Страница 194: ...CT Analyzer User Manual 192...
Страница 195: ...CT SB2 User Manual...
Страница 196: ...CT SB2 User Manual 2 Manual Version CTSB2 AE 3...
Страница 204: ...CT SB2 User Manual 10...
Страница 206: ...CT SB2 User Manual 12...
Страница 211: ...17 Hardware 1 x Cable bag Bag for cables and accessories Accessories Description...
Страница 212: ...CT SB2 User Manual 18...
Страница 226: ...CT SB2 User Manual 32...
Страница 242: ...CT SB2 User Manual 48...
Страница 248: ...CT SB2 User Manual 54...
Страница 250: ...CT SB2 User Manual 56...
Страница 252: ...CT SB2 User Manual 58...