GR-750x series
Control panel for addressable
emergency luminaires
Document number:
923750400_90_001_EN
Date: 25/5/2023
Page: 11 of 15
[11]
3 PANEL CONFIGURATION
3.1 Installation procedure
1
•
Mount the panel
2
•
Check each loop cable for correct polarity and open/short circuit.
3
•
Configure a valid and unique address for each point, on each loop.
4
•
Draw a schematic of the installation. Include cable length, cable cross-section and the location of
each device.
5
•
Connect the mains power supply to the panel.
6
•
Connect the two 12V lead-acid batteries in series and to the panel.
7
•
Configure the date and time of the panel.
(
MAIN-> Technician -> Setting -> Time and date
)
8
•
Detect and register all connected points.
(
MAIN -> Technician -> Setup -> Find all points
)
9
•
Compare the total number of detected luminaires for each loop with the schematic of the
installation.
10
•
(Optional) Group points in zones.
11
•
Configure the automatic function test procedure.
(MAIN -> Technician -> Test -> Set function test)
12
•
Configure the automatic duration test procedure.
(MAIN -> Technician -> Test -> Set duration test)
13
•
Let the panel operate uninterrupted for 30 minutes. Afterwards, check if there are any faults.
14
•
If there are faults present, preform the required actions to resolve them.
(Refer to 3.2 Troubleshooting for more information.)