61.
Place and align front and side facia for best possible fit with front capping side facia. Attach facia
to rafter ends with
6 - 1 1/2” Finishing Nails
per piece. Complete both front facia pieces.
Rafter/Facia Nailing Strip
Side Angle
Cut Facia
60.
Do a dry run first before securing. Position Front Facia up underneath roof panel and against
rafter ends. Have your helper hold in position. Place angle cut Side Facia underneath roof panel
against Rafter/Facia Nailing Strip. Align so Front Facia caps Side Facia and then attach the front
with
6 - 1 1/2” Finishing Nails
. Attach side with
5 - 1 1/2” Finishing Nails
securing them into the
nailing strip (closer to the top of the side facia board). Attach next piece of Front Facia.
Note:
With
Front Facia correctly aligned at corners, a small gap may occur at center seam. This will be covered
by Facia Detail Plate in
Step 62.
Small gap
may occur.
59.
Locate and identify all Facia pieces:
Front & Rear Facia
(4 @ 1/2” x 4” x 50 1/2”).
Side Angle Cut Facia
(2 @ 1/2” x 4” x 54 1/8”). In front corner,
align side and front Facia together
.
Front facia will cap side facia
.
Front
Facia
Front/Rear
caps side facia.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 31