OLT SM812-Metal Скачать руководство пользователя страница 1

8x12 SpaceMaker - Bevel 
with Metal Roof Assembly 

Manual

Version #2.0 

May 26, 2020

1-888-658-1658                        www.outdoorlivingtoday.com            [email protected]

Page 1

In the event of a missing or broken piece, call the Outdoor Living Today Customer Support Line @ 1-888-658-1658 with-
in 30 days of the delivery of your purchase. It is our commitment to you to courier replacement parts, free of charge, 
within 10 business days of this notification. Replacement parts will not be provided free of charge after the 30 day 
grace period.  
 
All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing 
and workmanship. Costs incurred for customer installations are not included. 
 
Failure to use supplied parts included in this kit could result in poor product performance and may void your warranty. 
Please contact Outdoor Living Today’s Customer Toll Free Line if you plan to deviate from our written instructions.

 

- Snow load ratings vary by geographical location. If heavy or wet snowfall occurs, it  
   is advisable to sweep snow off roof frequently. 
- If the product is elevated, any structural and building code requirements are solely 
   the customer's responsibility, and should be abided by.  
- In areas with high or gusty wind conditions, it is advisable to install the structure 
   securely to the ground. 
- Have a regular maintenance plan to ensure screws, doors, windows and parts are 
   tightly affixed.  

 
Customer agrees to hold Outdoor Living Today and any Authorized 
Dealers free of any liability for improper installation, maintenance and 
repair.

Safety Points and Other Considerations 
Our products are built for use based on 
proper installation on level ground and 
normal residential use. Please follow the  
instruction manual when building your  
shed and retain the manual for future  
maintenance purposes. 
 
Customers are responsible for ensuring 
a solid, level, well-draining site for  
construction.  
 
Please check with your local municipal 
or county by-laws before ordering this 
product to confirm it complies with  
building codes.

Thank you for purchasing a 
8x12 SpaceMaker. Please take 
the time to identify all the parts 
prior to assembly. 

Stock Code # 
SM812-Metal

Содержание SM812-Metal

Страница 1: ...l location If heavy or wet snowfall occurs it is advisable to sweep snow off roof frequently If the product is elevated any structural and building code requirements are solely the customer s responsibility and should be abided by In areas with high or gusty wind conditions it is advisable to install the structure securely to the ground Have a regular maintenance plan to ensure screws doors window...

Страница 2: ...rds 18 1 1 2 x 3 1 2 x 56 1 2 Roof Rafters 4 1 2 x 4 1 2 x 68 1 4 Soffits 3 3 4 x 3 1 2 x 72 Roof Gussets angle cut on ends 4 3 4 x 1 1 2 x 48 Rafter Nailing Cleats 4 3 4 x 2 1 2 x 51 Facia Nailing Strips Roof 8 3 4 x 3 1 2 x 49 1 4 Roof Batten Outside 4 3 4 x 3 1 2 x 45 1 2 Roof Batten Middle 8 3 4 x 3 1 2 x 72 Roof Batten Center 8 58 long x 39 wide Metal Roof Panels 3 60 long 13 wide Metal Ridge...

Страница 3: ...ack Headed Black Headed Y30 Single Rafter Bracket x 6 Y31 Double Rafter Bracket x 4 Door Section 1 31 1 2 x 72 Left Side Door 1 31 1 2 x 72 Right Side Door 2 1 2 x 2 1 2 x 72 Interior Vertical Door Stops 1 1 2 x 2 1 2 x 68 Interior Top Horizontal Door Stop 1 3 4 x 2 1 2 x 62 1 2 Door Threshold 1 1 2 x 2 1 2 x 71 Interior Door Flange Miscellaneous 1 Metal Window Insert 1 Window Trim Pkg 1 24 1 16 a...

Страница 4: ... adjust height as necessary Having a solid and level foundation is the most critical piece of work you can do to make the project go smoothly Most of this work can be done prior to your shed arriving 4x4 Pressure Treated Beam Foundation You can build directly on pressure treated beams or railroad ties laid on a properly prepared construction site as mentioned above Run beams perpendicular to floor...

Страница 5: ...Position Joist so flush with framing Parts Steps 1 6 Floor Joists 1 1 2 x 3 1 2 x 71 7 8 x 6 Floor Joist Frames Large 45 1 2 x 75 x 3 Floor Joist Frames Small 45 1 2 x 21 x 3 Hardware Steps 1 6 S1 2 1 2 Screws x 58 total A Floor Section Plywood Floor Large 3 Floor Joist Frames Large 3 Floor Runners 10 Plywood Floor Small 3 Concrete Pad optional foundation method Floor Joist Frames Small 3 Exploded...

Страница 6: ...arger and 3 smaller Frame Sections The Footprint for the floor when attached together will be 136 1 2 wide x 96 deep 5 Complete all large and small frame attachments Screw each completed section together with 8 2 1 2 Screws Front of Shed You can find the Square Drive Bit for the screws in with the Hardware Kit Bag 4 Attach each large and small floor joist frame together with 6 2 1 2 Screws per sec...

Страница 7: ...ing 9 Complete remaining Floor Runners 10 With Floor Runners attached carefully flip the floor over and place on your foundation Caution you will need 2 people to assist you Be careful when laying floor down not to bend or twist floor When in place level floor completely Note The floor will be flipped over and the floor runners will sit on your foundation It is important to note that having a leve...

Страница 8: ...as required 12 With Plywood positioned correctly on floor framing attach with 1 1 4 Screws Use screws every 16 push plywood together at seams Front Completed Floor configuration 11 Position all Large Small Plywood Floor pieces on top of completed floor joists The Plywood is cut slightly smaller than Floor framing Keep Plywood seams tight Parts Steps 11 12 Plywood Floor Large 45 3 8 x 74 7 8 x 3 Pl...

Страница 9: ...ut on one end and 2 square cut Gable Walls 4 Door Jambs 2 Narrow Wall Panels 2 Solid Wall Panels 7 Door Header Long 1 Bottom Wall Plates 7 Door Headers Short 2 13 Lay out all the wall panels and become familiar with their location On Standard Kits there are 7 Solid Wall Panels and 2 Narrow Wall Panels and 1 Window Wall Panel Make sure to position panels right side up so water is directed away from...

Страница 10: ... Plate Side of Shed 1st Side Wall Panel F r o n t o f S h e d 1st Side Wall Panel Rear of shed 2 x 3 w a l l f r a m e Flush with Floor Framing 1 2 overhang Important Make sure all walls are aligned in their upright position If not water may leak into your shed Unsure if panel is facing up or down Compare solid wall siding to window wall siding and match orientation 15 Starting at Rear Corner posi...

Страница 11: ...18 total 17 With the corner wall attachment complete position a second Rear Wall panel in place so bottom 2x3 wall framing is sitting flush with outside floor joists and plywood floor Wall siding should overhang floor by approximately 1 2 When positioned correctly attach both Rear Wall panel studs together as shown Do Not Attach Walls To Floor Until Step 23 Side Wall Rear Wall Optional Caulking se...

Страница 12: ...outdoorlivingtoday com Page 12 18 Complete all Side and Rear Solid Wall and Window Wall attachments as per Steps 15 17 Pilot Hole first Pilot Hole first Pilot Hole first Front of Shed Side Wall Panel will sit flush with Floor framing at Front of Shed ...

Страница 13: ...2 Screws each Position so Jamb is flush with tip of bevel siding on front Narrow Walls Complete both sides Parts Vertical Door Jambs 1 1 2 x 3 1 2 x 73 x 2 Hardware S1 2 1 2 Screws x 8 total Flush to tip of Bevel Flush with Narrow Wall stud on inside 19 Position and attach both Narrow Walls as per Steps 15 18 Parts Narrow Walls 12 x 73 x 2 Hardware S1 2 1 2 Screws x 6 total ...

Страница 14: ...lled above the door in Step 56 Pre drill to prevent splitting Parts Door Headers Short 2 x 3 1 2 x 6 1 2 x 2 Hardware S1 2 1 2 Screws x 4 total Notch to front and on top Pilot Hole first Pilot Hole first Notch to front and on top Pilot Hole first Sits flush with inside of Wall framing 22 Attach Long Door Header to Vertical Door Jambs and Narrow Walls with 2 2 1 2 Screws per side Position the notch...

Страница 15: ...lls corner to corner This should be approximately 159 7 8 More importantly if measurements are not within 1 4 your walls are not square Adjusting now will make it easier to install roof section Optional Caulking seams will help prevent moisture from entering your shed Caulking not included in kit 159 7 8 159 7 8 Angle screws into perimeter Floor Joists Pilot Hole first 6 4 24 Position Rear Top Pla...

Страница 16: ... with 3 2 1 2 Screws Note Prior to attaching try each combination of Gables for best fit Parts Triangular Gable Half Walls x 4 Hardware S1 2 1 2 Screws x 6 total 25 Next attach the Side Wall Top Plates The Side Wall Top Plates are angle cut down the length Once again position Top Plates on wall frame so they are flush Side Wall Top Plates will fit between Front Rear Plates Attach with 4 2 Screws p...

Страница 17: ... with an additional 6 Screws Screw from the bottom of Gable framing down into Top Wall Plate and Wall Framing Complete Gable positioning and attachment on the other side Hint Use a straight edge to check the angle of the Gable framing and Top Plate Both angles should line up see diagram above Hardware S3 2 Screws x 4 total 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page...

Страница 18: ...ected is 136 1 2 Connect other set of Ridge Boards the same Position metal Ridge Board Connector evenly on Ridge Boards Parts Ridge Boards Long 3 4 x 4 1 2 x 84 x 2 Ridge Boards Short 3 4 x 4 1 2 x 52 1 2 x 2 Hardware SS2 3 4 Screws x 16 total Y9 Ridge Board Connector x 2 total Metal Roof Cap 3 Metal Roof Panels 8 Roof Rafters 9 per side 18 Tot Ridge Boards 4 84 52 1 2 long Soffits 4 1 2 x 4 1 2 x...

Страница 19: ...tach completed Ridge Board to ends of both outside Rafters with 2 2 Screws per end Measure and position interior Rafters as illustrated below When positioned correctly attach Ridge Board to remaining Rafters with 2 2 Screws Rafter end 31 Attach end of a Soffit flush to ends of outside rafters with 2 1 1 4 Screws per Rafter end Drill pilot holes in Soffit to prevent splitting Complete both outside ...

Страница 20: ...l sit equally on gable framing and Soffit will sit approximately 1 8 away from wall panels Gable Notch Ridge Board Rafter 33 Slide Rafter Section up on gable framing until bottom of Ridge Board slips into gable notch Rafter should rest on gable framing Soffit Ridge Board 32 Flip Rafter Section over so Soffit is facing down Starting with one side lift completed Rafter Section up and place on gable ...

Страница 21: ... best fit prior to completing Gable attachment Hardware S3 2 Screws x 28 total 35 Place second completed Rafter Section on gable walls as per Steps 32 34 36 At the peak align Ridge Boards so they are flush together and secure them with 12 1 1 4 Screws Important If there is a gap between Ridge Boards have a helper push the Side Walls closer together from outside Walls should be 91 apart at top from...

Страница 22: ...crews Repeat for each side of the rafter and then on opposite side of the roof Parts Rafter Nailing Cleat 3 4 x 1 1 2 x 48 x 4 Hardware S2 1 1 4 Screws x 12 total Lineup Rafter Nailing Cleat approximatley 4 1 4 from end of rafter near soffit Lineup Rafter Nailing Cleat approximatley 4 1 4 from end of rafter near ridge board 4 1 4 4 1 4 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outd...

Страница 23: ...t Parts Roof Gussets 3 4 x 3 1 2 x 72 x 3 Hardware S3 2 Screws x 12 total 1 1 4 Screw 2 Screws 1 1 4 Screw 2 Screws 2 Screw 2 Screw 41 Attach all Single and Double Rafter Brackets where rafters meet Top Wall Plates inside of shed Attach with 2 1 1 4 Screws and 2 2 Screws per Single Rafter Bracket and 6 2 Screws per Double Rafter Bracket Have two helpers hold the Side Walls at the top from the outs...

Страница 24: ...ide Batten with 2 1 1 4 screws Parts Steps 42 46 Roof Batten Outside 3 4 x 3 1 2 x 49 1 4 x 8 Roof Batten Middle 3 4 x 3 1 2 x 45 1 2 x 4 Roof Batten Center 3 4 x 3 1 2 x 72 x 8 Hardware Steps 42 46 S2 1 1 4 Screws x40 total 43 Locate 2nd row of Center Roof Battens 72 long Place Batten 13 up from first row End of Batten should be in center of middle Rafter Attach with 2 1 1 4 screws Repeat for sec...

Страница 25: ...ter section as per Steps 42 45 47 Locate all Metal Roof Panels Starting with one side 4 panels place the first outside panel on Rafters Panel should overhang rafter at the bot tom slightly and at the top not exceed the apex of the ridge boards Parts Steps 47 57 Metal Roof Panels 39 wide x 58 long x 8 Metal Ridge Caps 60 long x 3 Foam Roof Enclosures Several Pieces Hardware Steps 47 57 Metal Roof S...

Страница 26: ...nt by approximatley 3 4 In the mean time have your helper hold the panel in place so it doesn t slide off Locate 2nd roof panel 49 Place 2nd Metal Roof Panel on Rafters and overlap panel with the first outside panel as shown above Temporarily position panel at top and bottom as per first panel Overlap 50 Place remaining 3rd and 4th Metal Roof Panels on Rafters as per Steps 48 49 Overlap Metal Roof...

Страница 27: ...res between Metal Roof Panels and Battens 53 Using 2 Metal Screw and 3 8 Nut Driver included secure outside Metal Roof Panel down to each Batten Metal screw is self tapping do not overtighten Screw through the peak of the Metal Roof Panel not the valley Use a total of 18 screws to secure Metal Roof Panels to lower 3 rows of Battens Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorl...

Страница 28: ...e attaching Metal Ridge Caps place strips of Foam Enclosures near to top Foam Enclosures will prevent moisture from coming in from the top Complete for both sides 56 Place all three Metal Ridge Caps on apex of roof Evenly space from front to back Metal Ridge Caps will overlap eachother Overhang the cap by approximatley 1 2 past each end 1 2 of overhang ...

Страница 29: ...e with 12 7 8 long self tapping metal screws Screw into final Batten with 5 16 Nut Driver Do not overtighten 58 Attach Facia Nailing strips 3 4 x 2 1 2 x 51 to the underside edge of Roof Battens with 4 1 1 4 screws per piece Nailing Strip will make it easier to attach Front and Rear Facia in Step 73 Complete front and rear strips 4 pieces total ...

Страница 30: ...ior to starting 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 30 Filler Trim 4 Vertical Door Trim 2 Door Pull Handle Exterior Barrel Bolt Left and Right Doors Door Hinges 6 Facia Nailing Strips 4 Wide Corner Trim 4 Corner Trim 4 Front Horizontal Gable Trim 2 Window Trim Kit 1 Window Insert 1 Flower Box Kit 1 Bottom Skirting 10 Side Wall Vertical Door Narrow Trim 6 Hor...

Страница 31: ...Skirting pieces first and attach with 4 1 1 2 Finishing Nails per piece Parts Bottom Skirting Bevel 3 4 x 4 1 2 x 45 1 4 x 10 Hardware N1 1 1 2 Finishing Nails x 40 total 60 Attach Filler Trim to each corner side wall Align Filler Trim so it sits flush with the bottom of the last piece of Wall siding Attach with 8 1 1 2 Finishing Nails per piece Parts Filler Trim 7 8 x 2 1 2 x 75 x 4 Hardware N1 1...

Страница 32: ...offits Attach with 4 1 1 2 Finishing Nails per piece Parts Top Wall Trim Bevel 3 4 x 1 1 2 x 45 1 4 x 6 Hardware N1 1 1 2 Finishing Nails x 24 total 62 Attach Rear Horizontal Gable Trims to the back of the shed Position over gable and wall seam with thick end of Bevel downward Use 5 1 1 2 Finishing Nails to secure each piece Parts Rear Horizontal Gable Trim Bevel 3 4 x 4 1 2 x 45 1 4 x 2 Hardware ...

Страница 33: ...tep as you will need to slide them into position in Step 66 Drip Cap rests in notch of Door Header 63 Position Drip Caps so they are overlapping above doorway resting in the notch of the Door Header The Drip Caps will not be attached until Step 66 Have a friend hold the Drip Caps in place while attaching the Front Horizontal Gable Trims covering the flange of the Drip Caps and centered side to sid...

Страница 34: ...rm positioning Use 8 1 1 2 Finishing Nails per piece to secure Complete other front corner the same Parts Steps 64 65 Corner Trim 1 2 x 3 1 2 x 79 x 4 Wide Corner Trim 1 2 x 5 1 2 x 82 x 4 Hardware Steps 64 65 N1 1 1 2 Finishing Nails x 64 total 65 Trim out rear corners with remaining pieces of Corner Trim and Wide Corner Trim Align and attach with 8 1 1 2 Finishing Nails per piece as per Step 64 ...

Страница 35: ... 66 With the Corner Trims attached slide the metal Drip Caps from Step 63 outward horizontally until they stop at the Wide Corner Trim Finish the Front Horizontal Gable Trim attachment with 5 1 1 2 Finishing Nails per piece Ensure the nails connect with the flange of the Drip Caps behind the Gable Trim to hold them in place ...

Страница 36: ...are N1 1 1 2 Finishing Nails x 32 total Align with bottom of Horizontal Gable Trim 68 Attach Rear Wall Narrow Trim where wall seams come together on back of shed Position equally on wall seam and flush with the bottom of the Horizontal Gable Trim Secure with 8 1 1 2 Finishing Nails Parts Rear Wall Narrow Trim 1 2 x 2 1 2 x 77 1 2 x 1 Hardware N1 1 1 2 Finishing Nails x 8 total 1 888 658 1658 www o...

Страница 37: ...ge Secure with 8 1 1 2 Finishing Nails per piece Parts Vertical Door Trim 1 2 x 2 1 2 x 79 x 2 Hardware N1 1 1 2 Finishing Nails x 16 total 70 Attach Horizontal Door Trim and Horizontal Narrow Wall Trim onto the exposed part of the Door Header and tight under the lip of the Drip Cap Secure Horizontal Door Trim with 5 1 1 2 Finishing Nails and the short Narrow Wall Trims with 2 1 1 2 Finishing Nail...

Страница 38: ...ry run using Side Facia to help you correctly position before attaching Parts Steps 72 73 Front Rear Facia Angle Cut Ends 3 4 x 3 1 2 x 58 x 4 Side Facia 3 4 x 3 1 2 x 71 3 4 x 4 Hardware Steps 72 73 N1 1 1 2 Finishing Nails x 64 total 71 Attach Horizontal Door Trim and Horizontal Narrow Wall Trim onto the exposed part of the Door Header and tight under the lip of the Drip Cap Secure Horizontal Do...

Страница 39: ...ate Pentagon Facia Detail Plate Horizontal Gable Detail Plate 74 Attach Pentagon Facia Plates where Front Rear Facias meet at the peak Secure with 4 1 1 2 Finishing Nails per piece Attach Facia Detail Plates to cover seams where Side Facia pieces meet Secure with 4 1 1 2 Finishing Nails per piece Attach Horizontal Gable Detail Plates to cover seams where Horizontal Gable Trims meet Secure with 4 1...

Страница 40: ...y on door trim as shown above and attach with Black 3 4 and 2 screws Parts Steps 75 77 Left Side Door 31 1 2 x 72 x 1 Right Side Door 31 1 2 x 72 x 1 Hardware Steps 75 77 Y1 Tee Hinges x 6 total SB1 3 4 Black Screws x 6 total SB2 2 Black Screws x 30 total 76 Next position and secure the Double Doors Starting with Right Side Door position so there is a 1 2 gap on bottom and approximately 3 8 on the...

Страница 41: ...ish so as not to strip screws 78 Attach Horizontal and Vertical Door Stops to Door Header and Jambs Start with Horizontal Stop first and then complete both Vertical Stops Position so door gap is covered Use 4 2 Screws per piece to secure Parts Horizontal Door Stop 1 2 x 2 1 2 x 68 x 1 Vertical Door Stops 1 2 x 2 1 2 x 72 x 2 Hardware S3 2 Screws x 12 total 79 Close both doors and align so doors ar...

Страница 42: ...n doors and drill hole where previously marked with 1 2 bit Attach Cane Bolt with 3 4 black screws Hardware Y6 Cane Bolt x 1 total SB1 3 4 Black Screws x 6 total 82 Attach Door Handles and Exterior Black Barrel Bolt to door Attach Barrel Bolt as illustrated above with 5 2 Black Screws 1 3 4 Black Screw Note how female part of Barrel Bolt is positioned higher than male Do a dry run first to positio...

Страница 43: ...ng only Parts Window Insert x 1 Hardware S2 1 1 4 Screws x 6 total 84 Once Insert is attached caulk the triangular gap between the Insert s outside flange and the siding Also put a bead of caulking horizontally at top of window where the flange and siding meet This additional caulking will also will reduce the chances of moisture entering into your shed 85 Position Window Trim around window doing ...

Страница 44: ...with Assembly Instructions included Position completed Flower Box below bottom of window trim and secure with 2 2 Screws Screw from inside of box into the center Window Wall stud Attach second screw 2 underneath first screw and once again into the wall stud Parts Flower Box Kit x 1 Hardware S3 2 Screws x 2 total ...

Страница 45: ...y other proprietary notices contained on the materials No material may be modified edited or taken out of context such that its use creates a false or misleading statement or impression as to the positions statements or actions Canadian Address 9393 287th Street Maple Ridge British Columbia Canada V2W 1L1 United States Address P O Box 96 Sumas Washington USA 98295 Outdoor Living Today Please call ...

Отзывы: