OLT 6x4 SPACE MASTER Скачать руководство пользователя страница 1

Important Information: 

- It is the sole responsibility of the customer to check with your local municipal or county by-laws before

ordering this product to confirm it complies with building codes in your area.

- If the product is elevated, any structural and building code requirements are solely the customer's

responsibility, and should be abided by.

- Snow load ratings vary by geographical location. If heavy or wet snowfall occurs, it is advisable to sweep

snow off roof frequently.

- In areas with high or gusty wind conditions, it is advisable to install the structure securely to the ground.
- Have a regular maintenance plan to ensure screws, doors, windows and parts are tightly affixed.
- All structures purchased from Outdoor Living Today are covered for a period of one year for defects in

manufacturing and workmanship. Costs incurred for customer installations are not included.

- Failure to use supplied parts included in this kit could result in poor product performance and may void your

warranty. Please contact Outdoor Living Today’s Customer Toll Free Line if you plan to deviate from our
written instructions.

Outdoor Living Today

www.outdoorlivingtoday.com             [email protected]

Page 1

Thank you for purchasing a 
6x4 Space Master.  Please 
take the time to identify all 
the parts prior to assembly. 

Version #1.0 
May 25, 2023

In the event of a missing or broken piece, simply call the Outdoor Living Today Customer Support Line  
@ 1-888-658-1658 within 30 days of the delivery of your purchase. It is our commitment to you to courier  
replacement parts, free of charge, within 10 business days of this notification. Replacement parts will not be 
provided free of charge after the 30 day grace period. 

Stock Code: 
SM64-TG-D-CEDAR

Customer agrees to hold Outdoor Living Today and any Authorized Dealers free of any liability for improper 
installation, maintenance and repair.

6x4 SPACE 

MASTER

 

  

WITH DOUBLE DOORS 
AND CEDAR ROOF

ASSEMBLY MANUAL

Содержание 6x4 SPACE MASTER

Страница 1: ...ncluded Failure to use supplied parts included in this kit could result in poor product performance and may void your warranty Please contact Outdoor Living Today s Customer Toll Free Line if you plan...

Страница 2: ...ensure there are no gas or electric lines buried in the area before digging Decide on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 st...

Страница 3: ...arrows 5 4x4 Pressure Treated Stringers 44 3 4 long required Evenly spaced with one at each end of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excav...

Страница 4: ...s 3 4 x 1 1 4 x 40 6 Rafters 1 1 2 x 2 1 2 x 41 3 4 2 Soffits 1 2 x 2 1 2 x 45 2 Roof Ridge Boards 3 4 x 3 1 2 X 45 26 39 D Trim Misc Section Lower Skirting 2 Lower Rear Skirting 1 2 x 2 1 2 x 35 3 4...

Страница 5: ...d Screw Finishing Shingle Nails Safety Glasses Work Gloves Ladder Screw Gun Drill Tape Measure Hammer Wood Clamp Level Pliers Silver Barrel Bolt Drop Latch 1 8 3 8 Drill Bits 1 1 2 Black Headed Bolt w...

Страница 6: ...tine Maintenance Routinely check all fasteners are tight ex Door Hinges Nails Brush off dirt from walls Brush off snow from roof regularily Routinely remove needles and leaves from cedar roof Painting...

Страница 7: ...Section on a level foundation only Patio Stones or a Concrete Slab both make excellent foundations See Page 3 for more information on foundations Use a level to confirm and shim Floor Joist as requir...

Страница 8: ...e 2 1 2 Brown Screws x 12 total Top Wall Plate Important Pilot hole ALL 2x2 Wall Studs with 1 8 drill bit prior to screwing This will make it much easier to attach together B Wall Section Exploded vie...

Страница 9: ...Side Wall 4 Starting with Rear Left Side Wall lift up and position so framing is flush with Floor at the rear of shed Make sure Wall frame is flush with outside of Floor on the side When Wall is posit...

Страница 10: ...Align Wall Framing Flush with Floor Framing Rear Left Side Wall Rear W all Panel Wall frame flush with outside Floor Wall siding will overhang Floor 6 When Side and Rear Walls are aligned in corner co...

Страница 11: ...rt Advice If you re placing the shed tight up against a fence or wall you may consider attaching the Rear Corner and Center Trim on Rear Wall seam first See Steps 47 50 Attach both Rear Walls together...

Страница 12: ...ottom Wall Plate to floor with 3 2 1 2 Brown Screws Important Confirm Siding on Side Wall Panels are aligned 2 1 2 Brown Screw 10 Postion second Right Side Wall on the floor Attach walls frames togeth...

Страница 13: ...itioned secure Bottom Wall Plate to Floor with 2 2 1 2 Brown Screws Attach vertical Wall framings together at top middle and bottom with 3 3 Brown Screws Wall frame flush with Floor Siding will overha...

Страница 14: ...x 4 total 2 1 2 Brown Screws 18 Locate Side and Center Top Plates and place on top of the Front Header With Front Top Plates positioned evenly and flush against Front Header secure using 6 1 1 4 Brow...

Страница 15: ...Side and Center Top Plates and place on top of Rear Walls With Top Plate positioned evenly and flush against Rear Wall framing secure using 6 1 1 4 Brown Screws screwing down from the top of Rear Top...

Страница 16: ...2 2 Brown Screws Gables may need slight adjustment in Step 34 when attachment will be completed with an additional 4 Screws Screw from the bottom of Gable framing down into Rear Top Wall Plate and Wal...

Страница 17: ...first Support using 2 1 1 4 Brown Screws Place Storage Shelf on attached Support Level and mark position of second Support Pilot Hole and secure second Support Storage Shelf Rear Wall Side Wall 24 Pla...

Страница 18: ...o complete the Rafter and Roof Section Identify all parts prior to starting 1 2 thick Soffit 41 3 4 Long Rafters Roof Ridge Boards 2 Cedar Shingle Roof Panels 2 Rafters 6 Soffits 2 25 Locate 6 Rafters...

Страница 19: ...erior Rafter as illustrated When positioned correctly attach Ridge Board to remaining Rafter with 2 2 Brown Screws Parts Steps 26 28 Rafters x 6 1 1 2 x 2 1 2 x 41 3 4 Ridge Boards x 2 3 4 x 3 1 2 x 4...

Страница 20: ...raming until bottom of Ridge Board slips into Gable notch Rafter should rest on gable framing 31 When Rafter section is correctly positioned outside rafters will sit equally on Gable framing and soffi...

Страница 21: ...Note you may have to remove the 2 temporary screws in Gable from Step 23 and reposition Gable for best fit prior to completing Gable attachment Hardware 2 Brown Screws x 20 total 35 Attach middle Raf...

Страница 22: ...Rafter Parts Steps 38 39 Cedar Shingle Roof Panel 45 x 53 x 2 Hardware Steps 38 39 90 Metal Brackets x 12 total 3 4 Silver Screws x 48 total 37 Lift up first Cedar Shingle Roof Panel and place on Raf...

Страница 23: ...l help the longevity of your shed Caulking not included in kit Filler Trims 8 Lower Front Skirting 2 Short 1 Long Vertical Door Frame Trims 2 Left and Right Doors with Hardware Door Flange Front Wide...

Страница 24: ...g Nails per piece Parts Lower Front Skirting Short 1 2 x 2 1 2 x 11 3 4 x 2 Long 1 2 x 2 1 2 x 47 Lower Side Skirting 1 2 x 2 1 2 x 21 3 4 x 4 Lower Rear Skirting 1 2 x 2 1 2 x 35 3 4 x 2 Hardware 1 1...

Страница 25: ...th Trims up underneath Cedar Roof and Soffit Align Front Wide Corner Trim with bottom of Side Corner Trim Side Corner Trim will cap Front Wide Corner Trim When correctly aligned attach each piece with...

Страница 26: ...Hardware 1 1 2 Finishing Nails x 12 total Side Corner Trim will cap Rear Wide Corner Trim 46 Locate Side Wall Trim Place in the center of the two side walls Attach trim close to the roof soffit with...

Страница 27: ...nishing Nails x 6 total Rear Center Trim Tight Underneath Upper Rear Horizontal Trim Outdoor Living Today www outdoorlivingtoday com sales outdoorlivingtoday com Page 27 50 Complete other Rear and Fro...

Страница 28: ...and Side Fascia to ends of Rafters with 6 1 1 2 Finishing Nails Gap where Fascia boards come together at peak will be covered in Step 52 Do a dry run using Side Fascia to help you correctly position...

Страница 29: ...rdware 1 1 2 Finishing Nails x 12 total 55 Locate Door Threshold and position on Floor at the opening Align tip of the bevel flush with the outside of Bottom Wall Plate Attach with 4 1 1 4 Brown Screw...

Страница 30: ...Door Parts Step 56 60 Left and Right Doors 22 1 4 x 61 3 8 Door Flange 1 2 x 2 1 2 x 61 3 8 Hardware Step 56 60 Black T Hinge x 4 total 1 1 2 Black Headed Bolt x 4 total 1 4 Silver Nut and Washer x 4...

Страница 31: ...plitting 1 8 gap 1 2 Screw per Hinge Initially 59 Position Left Side Door with Flange as per Step 58 Once again use only 1 2 Black Headed Screw per Hinge initially to secure door to Vertical Door Fram...

Страница 32: ...frame approximately 1 1 2 from top of Door frame and 1 from edge as pictured Use 2 1 1 4 Brown Screws to secure Plywood Spacer should fit flush underneath Interior Door Header when Door is closed Mar...

Страница 33: ...interfere with their closing Attach bottom piece first with hammer 65 Open Door and drill out marked Silver Barrel Bolt impression with a 3 8 Drill Bit Close Door slide Interior Silver Barrel Bolt in...

Страница 34: ...9 from end Place 2nd Ridge Cap 1 back from first cap Attach with 2 1 1 2 Shingle Nails 9 from end Alternate each Ridge Cap seam as you proceed Parts Steps 68 69 Roof Ridge Caps x 8 Ridge Cap Short x 1...

Страница 35: ...inal color we suggest that you treat the wood with a good oil base wood stain You may also wish to paint your new shed rather than stain it In both cases we recommend that you consult with a paint and...

Отзывы: