background image

6

5. 

When the boiler is installed in a con

fi

 ned space and 

all air is provided from the outdoors, the con

fi

 ned 

space shall be provided with two permanent openings, 

one commencing within 12 inches from the top and 

one commencing 12 inches from the bottom of the 

enclosure. The openings shall communicate directly, or 

by ducts, with the outdoors or spaces (crawl or attic) 

that freely communicate with the outdoors. One of the 

following methods must be used to provide adequate 

air for ventilation and combustion.

A.  When directly communicating with the outdoors, 

each opening shall have a minimum free area 

of 1 square inch per 4,000 BTU per hour of total 

input rating of all equipment in the enclosure. See 

 

Figure 3

 .

B.  When communicating with the outdoors by means 

of vertical ducts, each opening shall have a mini-

mum free area 1 square inch per 4,000 BTU per 

hour of total input rating of all appliances in the 

enclosed space. 

See  Figure 4 .

C.  If horizontal ducts are used, each opening shall 

have a minimum free area 1 square inch per 2,000 

BTU per hour total input rating of all appliances in 

the enclosed space. 

See  Figure 5 .

D.  When ducts are used, they shall be of the same 

cross sectional area as the free area of the area of 

the openings to which they connect. The minimum 

dimension of rectangular air ducts shall not be less 

than 3 inches.

6. 

In calculating free area using louvers, grills or screens 

for the above, consideration shall be given to their 

blocking effect. Screens used shall not be smaller than 

1/4 inch mesh. If the free area through a design of 

louver or grill is known, it should be used in calculating 

the size opening required to provide the free area 

speci

fi

 ed. If the design and free area is not known, it 

may be assumed that wood louvers will have 20-25% 

free area and metal louvers and grills will have 60-75% 

free area. Louvers and grills shall be 

fi

 xed in the open 

position or interlocked with the boiler so that they are 

opened automatically during boiler operation.

Figure 3  Boiler Installed In Confi ned Space - Air 

From Outdoors

Figure 4  Vertical Ducts

Figure 5  Horizontal Ducts

VENTILATION AND COMBUSTION AIR

Содержание OBC II Series

Страница 1: ...T IRON BOILER INSTALLATION OPERATION MAINTENANCE MANUAL Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com P N 240009512 Rev A 04 2012 Models OBC3...

Страница 2: ...nts may result in personal injury or loss of life TO THE OWNER Installation and service of this boiler must be performed by a qualified installer TO THE INSTALLER Leave all instructions with boiler fo...

Страница 3: ...a to be heated select boiler on basis of its Heating Capacity 5 Nozzle listed for use with Beckett Burner 6 Electrical service to be 120 Volts 15 Amps 60 Hz STANDARD EQUIPMENT Crated Boiler Flush Jack...

Страница 4: ...l base as near chimney as possible and centrally located with respect to the heat distribution system as practical Allow 24 inches in front top and right hand side for servicing and cleaning or removi...

Страница 5: ...sectional area of the openings to which they are connected Table 5 COMBUSTION AIR REQUIREMENTS Minimum Opening Requirement BTU Hr Input Mbh Unconfined Area Confined Area Outside Inside Outside Combust...

Страница 6: ...d each opening shall have a minimum free area 1 square inch per 2 000 BTU per hour total input rating of all appliances in the enclosed space See Figure 5 D When ducts are used they shall be of the sa...

Страница 7: ...ng as suggested in Figure 6 When boiler is used in connection with refrigerated systems A Chilled medium MUST BE IN PARALLEL with boiler Figure 6 Boiler Used In Connection With Refrigerated System B U...

Страница 8: ...t the system or condition of the installation Although this method of piping is not typically required for baseboard heating systems A This method is used to protect systems using radiant panels and t...

Страница 9: ...9 CONNECTING SUPPLY AND RETURN PIPING Figure 9 Bypass Piping Option Used to Protect From Converted Systems With High Water Temperature Figure 10 Typical Installation With Circulators...

Страница 10: ...10 CONNECTING SUPPLY AND RETURN PIPING Figure 11 Typical Installation With Valves Figure 12 Typical Installation With DHW...

Страница 11: ...fety relief valve outlet and downstream of union if used Terminate pipe with plain end not threaded Refer to local codes and appropriate ASME Boiler and Pressure Vessel Code for additional installatio...

Страница 12: ...chimney performance Chimney should extend at least 2 ft above any portion of building within 10 ft See Figure 15 It should produce a 06 to 08 inch W C draft as measured with draft gauge between boiler...

Страница 13: ...13 VENTING SYSTEM INSPECTION INSTALLATION P N 240005186 Rev 1 0 06 05 Figure 16 Final Placement Of Boiler With New Vent Safety Switch Installed...

Страница 14: ...ended E Compression fittings on suction line often allows air to be drawn into fuel pump making it difficult to maintain oil pressure at the nozzle F Do not run overhead fuel lines from tank to oil bu...

Страница 15: ...be installed on an inside wall about four feet above the floor 2 NEVER install a thermostat on an outside wall 3 Do not install a thermostat where it will be affected by drafts hot or cold pipes sunli...

Страница 16: ...16 WIRING DIAGRAMS Figure 19 Wiring Diagram...

Страница 17: ...ration Thermostat calls for heat Circulator turns on Limit checks boiler water temperature Burner ignition delayed until limit determines call for heat cannot be met by residual heat in boiler and hea...

Страница 18: ...h limit point Burner should start B Verify Primary Control and Flame Sensor Flame Failure simulate by shutting off oil supply with hand valve while burner is on Sixty seconds after flameout safety swi...

Страница 19: ...14 5 Disconnect oil line from burner Recommend replacing nozzle at start of each heating season Lubricate burner motor and circulator motor if required with few drops of good grade of light motor oil...

Страница 20: ...ECR International 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...

Отзывы: