4
• FOR INSTALLATION ON NON-COMBUSTIBLE FLOORS
ONLY - The boiler must not be installed on carpeting
or vinyl
fl
ooring. Minimum clearances to combustible
construction are:
Table 4 Clearance To Combustibles
TOP
24 IN.
FRONT
24 IN.
FLUE CONNECTOR
9 IN.
REAR
6 IN.
LEFT SIDE
6 IN.
RIGHT SIDE
24 IN.
NOTE:
Clearance for access should exceed fire protection
clearance.
• Install boiler in accordance with requirements of
authority having jurisdiction, or in the absence of such
requirements, CSA B139: Installation Code for Oil
Burning Equipment.
• Where required by authority having jurisdiction,
installation shall conform to Standard for Controls and
Safety Devices for Automatically Fired Boilers, ANSI/
ASME CSD-1.
• Locate boiler in front of
fi
nal position before removing
crate. Provide solid level base as near chimney as
possible and centrally located with respect to the heat
distribution system as practical.
• Allow 24 inches in front, top and right hand side for
servicing and cleaning or removing tankless water
heating coil.
• When installed in utility room, door should be wide
enough to allow largest boiler part to enter, or to permit
replacement of another appliance such as water heater.
• Boiler shall be installed such that the oil ignition system
components are protected from water (dripping,
spraying, rain etc.) during appliance operation and
service.
INSTALLATION PROCEDURE
• Remove crate and plastic protective wrapper, inspect for
damage.
• Move boiler to permanent position by sliding or walking.
WARNING
Improper installation, adjustment, alteration, service
or maintenance could result in death or serious
injury
.
!
WARNING
Fire hazard. Do not install boiler on combustible
fl
ooring or carpeting. Failure to follow these
instructions could result in death or serious injury.
!