background image

3

Table 1   RATINGS & DATA

Boiler Model 

Number

(1)

AHRI Oil Burner 

Input

(1)

Heating 

Capacity 

MBH

(4)

AHRI Net 

Ratings

(2)(4)

A.F.U.E. 

Rating

Min. Natural Draft 

Chimney Size

G.P.H.

MBH

(4)

Water MBH

Round

Square

OBC3095

0.95

133

114

99

84.0

6

8x8x15

OBC4100

1.00

140

121

105

85.0

6

8x8x15

OBC4115

1.15

161

137

119

84.0

6

8x8x15

NOTES:

1. AHRI burner capacity is based on an oil heating value of 140,000 Btu/gal and with 13% CO

2

.

2. Net AHRI Water Ratings shown are based on a piping and pickup allowance of 1.15.

3. Consult manufacturer before selecting boiler for installations having unusual piping and pickup requirements, 

such as intermittent system operation, extensive piping.

4. For forced hot water heating systems where boiler and all piping are within the area to be heated, select boiler 

on basis of its Heating Capacity.

5. Nozzle listed for use with Beckett Burner.

6. Electrical service to be 120 Volts, 15 Amps, & 60 Hz.

STANDARD EQUIPMENT: Crated Boiler, Flush Jacket, Oil Burner, Target Wall/

Liner, Circulator-1¼", Safety Relief Valve, Temperature Pressure Gauge, 

Drain Valve, Wiring Harness, Supply Tapping 1¼", Return Tapping 1¼", High 

Limit and Circulator Control, Primary Control.  For Tankless Heater Units-add 

Low Limit. 

RATINGS, DATA, AND DIMENSIONS

Table 2   TANK-LESS WATER HEATER CAPACITIES

Boiler 

Model 

Number

Input 

Rate 

G.P.H.

Tankless 

Heater 

Number

Tankless Heater 

Capacity Intermittent 

Draw G.P.M.

Boiler Water 

Content 

(Gallons)

OBC3095

0.95

L-24

3.25

6.7

OBC4100

1.00

L-24

3.25

8.2

OBC4115

1.15

L-24

4.00

8.2

Table 3     DIMENSIONS

Boiler No.

Length 

of Flush 

Jacket

Front of Jacket 

to Center Line 

of Flue Outlet

Flue 

Outlet 

Diameter

Tankless 

Coil to Back 

of Jacket

-A-

-B-

-C-

-D-

OBC3

19"

9 ¾"

6"

8

OBC4

23"

11¾"

6"

12¾

Figure 1  - Dimensions

Содержание OBC II Series

Страница 1: ...T IRON BOILER INSTALLATION OPERATION MAINTENANCE MANUAL Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com P N 240009512 Rev A 04 2012 Models OBC3...

Страница 2: ...nts may result in personal injury or loss of life TO THE OWNER Installation and service of this boiler must be performed by a qualified installer TO THE INSTALLER Leave all instructions with boiler fo...

Страница 3: ...a to be heated select boiler on basis of its Heating Capacity 5 Nozzle listed for use with Beckett Burner 6 Electrical service to be 120 Volts 15 Amps 60 Hz STANDARD EQUIPMENT Crated Boiler Flush Jack...

Страница 4: ...l base as near chimney as possible and centrally located with respect to the heat distribution system as practical Allow 24 inches in front top and right hand side for servicing and cleaning or removi...

Страница 5: ...sectional area of the openings to which they are connected Table 5 COMBUSTION AIR REQUIREMENTS Minimum Opening Requirement BTU Hr Input Mbh Unconfined Area Confined Area Outside Inside Outside Combust...

Страница 6: ...d each opening shall have a minimum free area 1 square inch per 2 000 BTU per hour total input rating of all appliances in the enclosed space See Figure 5 D When ducts are used they shall be of the sa...

Страница 7: ...ng as suggested in Figure 6 When boiler is used in connection with refrigerated systems A Chilled medium MUST BE IN PARALLEL with boiler Figure 6 Boiler Used In Connection With Refrigerated System B U...

Страница 8: ...t the system or condition of the installation Although this method of piping is not typically required for baseboard heating systems A This method is used to protect systems using radiant panels and t...

Страница 9: ...9 CONNECTING SUPPLY AND RETURN PIPING Figure 9 Bypass Piping Option Used to Protect From Converted Systems With High Water Temperature Figure 10 Typical Installation With Circulators...

Страница 10: ...10 CONNECTING SUPPLY AND RETURN PIPING Figure 11 Typical Installation With Valves Figure 12 Typical Installation With DHW...

Страница 11: ...fety relief valve outlet and downstream of union if used Terminate pipe with plain end not threaded Refer to local codes and appropriate ASME Boiler and Pressure Vessel Code for additional installatio...

Страница 12: ...chimney performance Chimney should extend at least 2 ft above any portion of building within 10 ft See Figure 15 It should produce a 06 to 08 inch W C draft as measured with draft gauge between boiler...

Страница 13: ...13 VENTING SYSTEM INSPECTION INSTALLATION P N 240005186 Rev 1 0 06 05 Figure 16 Final Placement Of Boiler With New Vent Safety Switch Installed...

Страница 14: ...ended E Compression fittings on suction line often allows air to be drawn into fuel pump making it difficult to maintain oil pressure at the nozzle F Do not run overhead fuel lines from tank to oil bu...

Страница 15: ...be installed on an inside wall about four feet above the floor 2 NEVER install a thermostat on an outside wall 3 Do not install a thermostat where it will be affected by drafts hot or cold pipes sunli...

Страница 16: ...16 WIRING DIAGRAMS Figure 19 Wiring Diagram...

Страница 17: ...ration Thermostat calls for heat Circulator turns on Limit checks boiler water temperature Burner ignition delayed until limit determines call for heat cannot be met by residual heat in boiler and hea...

Страница 18: ...h limit point Burner should start B Verify Primary Control and Flame Sensor Flame Failure simulate by shutting off oil supply with hand valve while burner is on Sixty seconds after flameout safety swi...

Страница 19: ...14 5 Disconnect oil line from burner Recommend replacing nozzle at start of each heating season Lubricate burner motor and circulator motor if required with few drops of good grade of light motor oil...

Страница 20: ...ECR International 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...

Отзывы: