background image

19

Annual Inspection - Before Start of Heating Season

Periodically or at start of heating season inspect boiler, vent 

and vent pipe for accumulation of soot or scale deposits. 

When soot is present on section walls and 

fl

 ueways, 

improper combustion results, causing additional sooting 

and scaling until 

fl

 ueways are completely closed. 

A.  To remove soot and scale from 

fl

 ueways, remove 

top jacket panel, top clean-out plate and burner. See 

instructions on Removing Oil Boiler. Use wire brush, 

brush soot and scale into combustion chamber where 

it can be removed through burner opening. 

B.  Carefully vacuum debris from combustion chamber. 

Inspect combustion chamber for signs of damage, i.e. 

cracks. 

C.  In event combustion chamber is damaged, contact 

quali

fi

 ed service agent to replace immediately. 

NOTICE

Do not overtighten bolts.

Periodic inspection

 and tightening of tankless heater/

cover plate bolts reduce the risk of leaks. CAUTION: Do not 

overtighten bolts.

MAINTENANCE PROCEDURES

Instructions For Removing Oil Burner

1. 

Turn off power to boiler.

2. 

Allow boiler to cool down.

3. 

Remove three (3) 1/2" nuts from burner 

fl

 ange.

4. 

Close oil valve. 

See  Figure 17  and  Figure 18, Page 14 .

5. 

Disconnect oil line from burner. 

Recommend replacing nozzle at start of each heating 

season. 
Lubricate burner motor and circulator motor - if required - 

with few drops of good grade of light motor oil. Do not over 

oil. 
Have quali

fi

 ed service agent service burner and check 

controls and electrodes for carbon or cracks in insulators. 

Adjust burners to produce conditions shown in Start-up and 

Adjustment of Oil Burner procedure.

Instructions For Replacing Oil Burner

1. 

Reconnect oil line.

2. 

Open oil valve. 

See  Figure 17, Page 14  and  Figure 18, 

Page 14 .

3. 

Install and tighten three (3) 1/2" nuts on burner 

fl

 ange.

4. 

Turn on power to boiler.

Regular Maintenance

• Inspect venting system at start of each heating season. 

Check vent pipe from boiler to chimney for signs 

of deterioration by rust or sagging joints. Repair if 

necessary.

• Remove vent pipe at base of chimney or 

fl

 ue. Use mirror, 

check for obstruction.

• Verify compliance with National Building Code of Canada, 

or CAN/CSA A405.

• Operate lever of safety relief valve on boiler periodically 

to verify that it is functioning properly. Open pressure 

relief valve before water pressure exceeds 30 psi reading 

on gauge. If pressure is exceeded and pressure relief 

valve leaks water when boiler is operating at normal 

pressures, replace immediately. Corrosion can build at 

valve seat and prevent functioning as safety device.

Содержание OBC II Series

Страница 1: ...T IRON BOILER INSTALLATION OPERATION MAINTENANCE MANUAL Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com P N 240009512 Rev A 04 2012 Models OBC3...

Страница 2: ...nts may result in personal injury or loss of life TO THE OWNER Installation and service of this boiler must be performed by a qualified installer TO THE INSTALLER Leave all instructions with boiler fo...

Страница 3: ...a to be heated select boiler on basis of its Heating Capacity 5 Nozzle listed for use with Beckett Burner 6 Electrical service to be 120 Volts 15 Amps 60 Hz STANDARD EQUIPMENT Crated Boiler Flush Jack...

Страница 4: ...l base as near chimney as possible and centrally located with respect to the heat distribution system as practical Allow 24 inches in front top and right hand side for servicing and cleaning or removi...

Страница 5: ...sectional area of the openings to which they are connected Table 5 COMBUSTION AIR REQUIREMENTS Minimum Opening Requirement BTU Hr Input Mbh Unconfined Area Confined Area Outside Inside Outside Combust...

Страница 6: ...d each opening shall have a minimum free area 1 square inch per 2 000 BTU per hour total input rating of all appliances in the enclosed space See Figure 5 D When ducts are used they shall be of the sa...

Страница 7: ...ng as suggested in Figure 6 When boiler is used in connection with refrigerated systems A Chilled medium MUST BE IN PARALLEL with boiler Figure 6 Boiler Used In Connection With Refrigerated System B U...

Страница 8: ...t the system or condition of the installation Although this method of piping is not typically required for baseboard heating systems A This method is used to protect systems using radiant panels and t...

Страница 9: ...9 CONNECTING SUPPLY AND RETURN PIPING Figure 9 Bypass Piping Option Used to Protect From Converted Systems With High Water Temperature Figure 10 Typical Installation With Circulators...

Страница 10: ...10 CONNECTING SUPPLY AND RETURN PIPING Figure 11 Typical Installation With Valves Figure 12 Typical Installation With DHW...

Страница 11: ...fety relief valve outlet and downstream of union if used Terminate pipe with plain end not threaded Refer to local codes and appropriate ASME Boiler and Pressure Vessel Code for additional installatio...

Страница 12: ...chimney performance Chimney should extend at least 2 ft above any portion of building within 10 ft See Figure 15 It should produce a 06 to 08 inch W C draft as measured with draft gauge between boiler...

Страница 13: ...13 VENTING SYSTEM INSPECTION INSTALLATION P N 240005186 Rev 1 0 06 05 Figure 16 Final Placement Of Boiler With New Vent Safety Switch Installed...

Страница 14: ...ended E Compression fittings on suction line often allows air to be drawn into fuel pump making it difficult to maintain oil pressure at the nozzle F Do not run overhead fuel lines from tank to oil bu...

Страница 15: ...be installed on an inside wall about four feet above the floor 2 NEVER install a thermostat on an outside wall 3 Do not install a thermostat where it will be affected by drafts hot or cold pipes sunli...

Страница 16: ...16 WIRING DIAGRAMS Figure 19 Wiring Diagram...

Страница 17: ...ration Thermostat calls for heat Circulator turns on Limit checks boiler water temperature Burner ignition delayed until limit determines call for heat cannot be met by residual heat in boiler and hea...

Страница 18: ...h limit point Burner should start B Verify Primary Control and Flame Sensor Flame Failure simulate by shutting off oil supply with hand valve while burner is on Sixty seconds after flameout safety swi...

Страница 19: ...14 5 Disconnect oil line from burner Recommend replacing nozzle at start of each heating season Lubricate burner motor and circulator motor if required with few drops of good grade of light motor oil...

Страница 20: ...ECR International 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...

Отзывы: