background image

14

Oil Tank and Piping Installation

• Install oil tank and piping in accordance with the National 

Board of Fire Underwriters and local regulations. 

• Oil storage tank, vent, 

fi

 ll pipe and caps should be as 

prescribed by local codes. In no case should the vent pipe 

be smaller than 1¼" I.P.S. The 

fi

 ll pipe should not be less 

than 2" I.P.S.

• Suction line from tank to burner shall be one continuous 

piece of tubing to prevent air entering the line. 
A.  Suction line, must be 

" O.D. copper tubing for runs 

of 50 feet or less, and ½" O.D. for longer runs. 

B.  Install oil return line same size suction line. Use on 

any installation where bottom of tank is below fuel 

unit of burner. 

C.  Oil lines should be buried or otherwise protected from 

mechanical injury. 

D. Flare 

fi

 ttings on all oil lines are recommended. 

E. Compression 

fi

 ttings on suction line often allows air 

to be drawn into fuel pump, making it dif

fi

 cult to 

maintain oil pressure at the nozzle. 

F.  Do not run overhead fuel lines from tank to oil 

burner.

• Install fuel pump connections and by-pass according to 

instructions attached to the fuel pump. If tank is more 

than 20'  from boiler, install two stage fuel unit in place 

of single stage pump supplied as standard equipment 

with burner. Verify rotation and speed are same and 

pump is suitable for burner horsepower rating.

• Install oil line 

fi

 lter and shut-off valve in suction line. 

Install shut-off valves in both suction and return lines 

at burner for servicing burner. Allow extra tubing at 

burner so burner may be removed from boiler for 

cleaning without disconnecting tubing. See 

 

Figure 17

  and 

 Figure 18 . 

Optional 

fl

 exible oil line is available.

OIL TANK AND PIPING

Figure 17 

 Typical Installation Single Pipe Oil 

System

Figure 18 

 Typical Installation Two Pipe Oil 

System

Содержание OBC II Series

Страница 1: ...T IRON BOILER INSTALLATION OPERATION MAINTENANCE MANUAL Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com P N 240009512 Rev A 04 2012 Models OBC3...

Страница 2: ...nts may result in personal injury or loss of life TO THE OWNER Installation and service of this boiler must be performed by a qualified installer TO THE INSTALLER Leave all instructions with boiler fo...

Страница 3: ...a to be heated select boiler on basis of its Heating Capacity 5 Nozzle listed for use with Beckett Burner 6 Electrical service to be 120 Volts 15 Amps 60 Hz STANDARD EQUIPMENT Crated Boiler Flush Jack...

Страница 4: ...l base as near chimney as possible and centrally located with respect to the heat distribution system as practical Allow 24 inches in front top and right hand side for servicing and cleaning or removi...

Страница 5: ...sectional area of the openings to which they are connected Table 5 COMBUSTION AIR REQUIREMENTS Minimum Opening Requirement BTU Hr Input Mbh Unconfined Area Confined Area Outside Inside Outside Combust...

Страница 6: ...d each opening shall have a minimum free area 1 square inch per 2 000 BTU per hour total input rating of all appliances in the enclosed space See Figure 5 D When ducts are used they shall be of the sa...

Страница 7: ...ng as suggested in Figure 6 When boiler is used in connection with refrigerated systems A Chilled medium MUST BE IN PARALLEL with boiler Figure 6 Boiler Used In Connection With Refrigerated System B U...

Страница 8: ...t the system or condition of the installation Although this method of piping is not typically required for baseboard heating systems A This method is used to protect systems using radiant panels and t...

Страница 9: ...9 CONNECTING SUPPLY AND RETURN PIPING Figure 9 Bypass Piping Option Used to Protect From Converted Systems With High Water Temperature Figure 10 Typical Installation With Circulators...

Страница 10: ...10 CONNECTING SUPPLY AND RETURN PIPING Figure 11 Typical Installation With Valves Figure 12 Typical Installation With DHW...

Страница 11: ...fety relief valve outlet and downstream of union if used Terminate pipe with plain end not threaded Refer to local codes and appropriate ASME Boiler and Pressure Vessel Code for additional installatio...

Страница 12: ...chimney performance Chimney should extend at least 2 ft above any portion of building within 10 ft See Figure 15 It should produce a 06 to 08 inch W C draft as measured with draft gauge between boiler...

Страница 13: ...13 VENTING SYSTEM INSPECTION INSTALLATION P N 240005186 Rev 1 0 06 05 Figure 16 Final Placement Of Boiler With New Vent Safety Switch Installed...

Страница 14: ...ended E Compression fittings on suction line often allows air to be drawn into fuel pump making it difficult to maintain oil pressure at the nozzle F Do not run overhead fuel lines from tank to oil bu...

Страница 15: ...be installed on an inside wall about four feet above the floor 2 NEVER install a thermostat on an outside wall 3 Do not install a thermostat where it will be affected by drafts hot or cold pipes sunli...

Страница 16: ...16 WIRING DIAGRAMS Figure 19 Wiring Diagram...

Страница 17: ...ration Thermostat calls for heat Circulator turns on Limit checks boiler water temperature Burner ignition delayed until limit determines call for heat cannot be met by residual heat in boiler and hea...

Страница 18: ...h limit point Burner should start B Verify Primary Control and Flame Sensor Flame Failure simulate by shutting off oil supply with hand valve while burner is on Sixty seconds after flameout safety swi...

Страница 19: ...14 5 Disconnect oil line from burner Recommend replacing nozzle at start of each heating season Lubricate burner motor and circulator motor if required with few drops of good grade of light motor oil...

Страница 20: ...ECR International 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...

Отзывы: