
1-3-96
Contents
Displays the status of finisher's switches and sensors operation.
Purpose
Execute for the finisher's switches and sensors operation check.
Method
1.Press the [Start] key.
2.Select the item to operate.
*: The screen for setting is displayed.
Method: Finisher
1.Check the switches and sensors by manually turning them on/off.
*: The switch indication is inversed when the switch is detected.
U241
Finisher switch check
(Message: Check Finisher Switches)
Items
Contents
Finisher
Check the finisher switch and sensor operation.
Mail Box
Check the mail Box switch and sensor operation.
Punch
Check the punch unit switch and sensor operation.
Items
Contents
Front Cover
DF front cover switch
Eject Cover *1
DF exit cover switch
Top Cover *2
DF top cover switch
Tray U-Limit
DF tray sensor 1
Tray HP2 *1
DF tray sensor 2
Tray Middle
DF tray sensor 3
Tray L-Limit
DF Tray sensor 4
Tray Top
DF tray upper side sensor
HP
DF paper entry sensor
Sub Tray Eject *1
DF sub tray exit sensor
Middle Tray Eject
DF middle exit sensor
Drum *1
DF drum sensor
Staple HP
DF slide sensor
Middle Tray
DF bundle exit sensor
Width Front HP
DF width adjustment 1
Width Tail HP
DF width adjustment 2
Bundle Eject HP
DF bundle exit sensor
Match Paddle
DF adjustment sensor
Lead Paddle
DF paddle sensor
Shift Front HP *1
DF shift sensor 1
Shift Tail HP *1
DF shift sensor 2
Shift Unlock HP *1
DF shift release sensor
Y11
8
240-1
Service Manual
Содержание d-Copia 3002MF plus
Страница 1: ...SERVICE MANUAL 0XOWLIXFWLRQ LJLWDO RSLHU Code Y118240 1 d Copia 3002MF plus d Copia 3502MF plus...
Страница 4: ...This page is intentionally left blank...
Страница 10: ...This page is intentionally left blank...
Страница 67: ...1 2 40 This page is intentionally left blank Y118240 1 Service Manual...
Страница 484: ...2 2 8 This page is intentionally left blank Y118240 1 Service Manual...
Страница 548: ...Installation Guide DP 7100 Document processor Installation Guide...
Страница 549: ...DP 7100...
Страница 550: ...INSTALLATION GUIDE GUIDE D INSTALLATION GU A DE INSTALACION INSTALLATIONSANLEITUNG GUIDA ALL INSTALLAZIONE DP 7100...
Страница 553: ...2 1mm 0mm A D C B B A...
Страница 554: ...3 E A...
Страница 555: ...4 I M3x8 F G M4x10 K J H A...
Страница 556: ...5 ON A...
Страница 558: ...7 D E B...
Страница 559: ...8 F G M4x10 H I M3x8 K J B...
Страница 560: ...9 B...
Страница 570: ...19 8 6 7 10 11 9 A B...
Страница 580: ...DP 7110 Document processor Installation Guide...
Страница 581: ...INSTALLATION GUIDE GUIDE D INSTALLATION GU A DE INSTALACION INSTALLATIONSANLEITUNG GUIDA ALL INSTALLAZIONE DP 7110...
Страница 584: ...2 2 2 C M4x14 E 2 A...
Страница 585: ...3 F G H M3x8 BLACK A...
Страница 586: ...4 I A...
Страница 587: ...5 J L K M3x8 K M3x8 K M3x8 A...
Страница 588: ...6 O N A...
Страница 589: ...7 ON A...
Страница 591: ...9 2 2 2 C M4x14 E B...
Страница 592: ...10 F G H M3x8 BLACK B...
Страница 593: ...11 I B...
Страница 594: ...12 J L P K M3x8 K M3x8 B...
Страница 595: ...13 O N B...
Страница 615: ...DP 7120 Document processor Installation Guide...
Страница 616: ...INSTALLATION GUIDE GUIDE D INSTALLATION GU A DE INSTALACION INSTALLATIONSANLEITUNG GUIDA ALL INSTALLAZIONE DP 7120...
Страница 619: ...2 1mm 0mm B B A D C A...
Страница 620: ...3 E A...
Страница 621: ...4 G F F H ON 10 mm 10 mm A...
Страница 623: ...6 D B...
Страница 624: ...7 E B...
Страница 625: ...8 F ON G F H 10 mm 10 mm B...
Страница 634: ...17 2 6 7 3 4 5 A B...
Страница 636: ...19 9 11 10 13 14 12 10 mm A B...
Страница 646: ...PF 791 500 x 2 Paper feeder Installation Guide...
Страница 647: ...INSTALLATION GUIDE GUIDE D INSTALLATION GU A DE INSTALACION INSTALLATIONSANLEITUNG GUIDA ALL INSTALLAZIONE PF 791...
Страница 654: ...PF 810 3000 sheet deck Installation Guide...
Страница 655: ...INSTALLATION GUIDE GUIDE D INSTALLATION GU A DE INSTALACION INSTALLATIONSANLEITUNG GUIDA ALL INSTALLAZIONE PF 810...
Страница 667: ...DF 791 3000 sheet finisher Installation Guide...
Страница 668: ...INSTALLATION GUIDE GUIDE D INSTALLATION GU A DE INSTALACION INSTALLATIONSANLEITUNG GUIDA ALL INSTALLAZIONE DF 791...
Страница 682: ...DF 7120 1000 sheet finisher Installation Guide...
Страница 683: ...INSTALLATION GUIDE GUIDE D INSTALLATION GU A DE INSTALACION INSTALLATIONSANLEITUNG GUIDA ALL INSTALLAZIONE DF 7120...
Страница 686: ...2 7 7 15 a b a a b b b a A...
Страница 687: ...3 A...
Страница 688: ...4 c d 14 c d c d 12 c d c d 14 c d c d 12 c d A...
Страница 689: ...5 D ON A...
Страница 691: ...7 L B...
Страница 692: ...8 PF 791 PF 810 PF 791 PF 810 PF 79 1 PF 81 0 PF 791 PF 810 PF 810 PF 810 PF 791 AA AA C M4x8 C M4x8 E F M4x20 F M4x20 B...
Страница 693: ...9 G B...
Страница 694: ...10 b a 17 17 25 a b a a b b B...
Страница 695: ...11 c d 24 c d c d 22 c d B...
Страница 696: ...12 B...
Страница 697: ...13 ON D B...
Страница 700: ...AK 740 Bridge unit Installation Guide...
Страница 702: ...MT 730 Mailbox Installation Guide...
Страница 703: ...INSTALLATION GUIDE GUIDE D INSTALLATION GU A DE INSTALACION INSTALLATIONSANLEITUNG GUIDA ALL INSTALLAZIONE MT 730 B...
Страница 717: ...PH 7A C D Punch unit Installation Guide...
Страница 738: ...DT 730 B Document tray Installation Guide...
Страница 740: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8...
Страница 741: ...FAX System 12 Installation Guide...
Страница 742: ...INSTALLATION GUIDE GUIDE D INSTALLATION GU A DE INSTALACION INSTALLATIONSANLEITUNG GUIDA ALL INSTALLAZIONE FAX System 12...