Oliveri Milan MI71 Скачать руководство пользователя страница 1

 

 

 

 

 

 
 
  

 

 

Installation Instructions

CARE & MAINTENANCE

Surfaces should be cleaned with a soft cloth and warm soapy water. Rinse and dry after
cleaning. Under no circumstances should abrasive or acid based cleaning products be used.

This basin is warranted to be free from manufacturing defects for a period of:

Lifetime, stainless steel bowl

This warranty does not cover against normal wear and will be voided if the 
product is misused or not installed in accordance with these instructions.

In the event this product is rendered obsolete and a replacement product is required, 

Our goods come with guarantees that cannot be excluded under the Australian Consumer 
Law. You are entitled to a replacement or refund for a major failure and for compensation 
for any other reasonably foreseeable loss or damage. You are also entitled to have the 
goods repaired or replaced if the goods fail to be acceptable quality and the failure does 
not amount to a major failure.
 
For full warranty information, visit: 

https://oliveri.com.au/service-and-warranty 

If the basin requires servicing, please contact your installer (preferably the one who 

All warranty claims must be directed to our Warranty Service Agent. If the Warranty Service 
Agent finds that the basin is not faulty, they reserve the right to pass on any callout fee to
the householder.

WARRANTY

SINK SERVICE

oliveri.com.au

1. Determine where on the bench top the basin is to be installed.
2. Place the basin in position and check to ensure the basin waste outlet position does 

not interfere with drawers, internal walls or waste connection pipe work.

3. Mark the waste hole position on the bench top. Using a suitable cutting devise based 

on bench top material, cut a hole in the bench top large enough to accommodate the
recess on the bottom of the basin and the waste being used (hole diameter 80 - 92mm).

4. Fit waste to basin as per waste installation instruction document.
5. Run a bead of neutral cure silicone around the underside edge of the basin.
6. Fit basin to bench top and remove any excess silicone. Allow silicone to set before 

proceeding with waste pipe installation. 

Oliveri Solutions Pty Ltd reserves the right to supply a product of equal substitution at 

installed it). If the installer is satisfied that the problem is not due to poor installation, 
contact Oliveri’s nominated 

Warranty Service Agent

. For details visit:

https://oliveri.com.au/service-and-warranty

TF11a - MI71 Installation Instructions

Remove product from packaging:

Check the product for damage, if the product is damaged return to store of purchase.
Check the product is complete with all components required to install.
This product is to only be installed by a licensed plumber, failing to do so will void
the warranty.
This product is to be installed as per Australian Standard and local authority requirements.

Basin installation:

Installation Instructions

INSTALLATION INSTRUCTIONS FOR COUNTER TOP BASIN

Milan

Pop-up waste, 1 year, parts and labour.

their discretion.

MI71

Round Stainless Steel Counter Top Basin

THIS BASIN MUST BE INSTALLED BY A LICENSED PLUMBER IN 
ACCORDANCE WITH LOCAL REGULATIONS.  

Scratching during use does not constitute a product or manufacturing fault.

 

NOTE: We recommend installing the basin so the Oliveri logo is positioned   

 

towards the back of the bench, and/or under the tap.

 

Отзывы: