47
EN
3.4 - INSTALLATION
3.4.7 - DHW BOILER INSTALLATION
Considered the dimensions and the weight
of the boiler, the operation must be executed
by atleast 2 qualified operators. It is strictly
forbidden to move the boiler by the installed
fittings.
• Fasten the E10 feet to the cabinet base in
position A3 with B7 screws (3x);
• Fasten all 3 feet in E10.
Verify the sustain of the fastenings
Faulty fastenings can lead to damage to
people, objects and animal with fatal circu-
mstances.
Incorrect handling
Personal injury by cuts and abrasions
Flooding due to water leaking.
Damage to the product or surrounding
objects by chips fly, impacts, incisions or
crushing.
13
3.4.6 - PREASSEMBLED HYDRAULIC KIT
INSTALLATION
• Prepare C10 screws in position A2 (greyed
out upper holes);
• Install the C1 kit and fasten it by tightening
the C10 screws, and then place and tighten
the C10 screws in A2 position (greyed out
lower holes).
C1
C10
13