background image

TOOLS REQUIRED:

   

Powered screwdriver.

Installation Guide

myofficelinkgroup.com

Modulus Twin Pole 

Double Span Table

Содержание Modulus

Страница 1: ...TOOLS REQUIRED Powered screwdriver Installation Guide myofficelinkgroup com Modulus Twin Pole Double Span Table ...

Страница 2: ... x2 9 Cross Connector x1 10 T Tube x6 11 Collar Plug x4 12 T Tube Collar Connector x6 13 Minus Gasket x2 14 150 Gasket x4 15 Foot Glide x6 16 Top Rail Caps x 17 Steel Strap x3 18 Plastic Support x4 19 Table Top Bracket Plate x2 20 Table Top x2 SCREWS 21 M8x16mm x28 22 M10x110mm x6 23 M10x30mm x6 24 M8x25mm x6 25 M5x30mm Self Tapping x12 26 M5x20mm x47 22 15 13 14 26 4 23 24 25 18 9 12 10 8 2 26 3 ...

Страница 3: ...eat with all cross collars Slide the large foot and T tube connector into the collar place the 150 gasket on top and fully tighten the 2 M8x16mm bolts into the collar Repeat with all 150 collars Using 2 T tubes connect the assembled centre feet to the bottom cross connector and fully tighten the 4 M8x16mm bolts Using 2 T tubes connect the assembled corner feet to the bottom T connector and fully t...

Страница 4: ... the collars Screw all glides into the base of the large feet leaving the glides one turn from tight then they can be adjusted easily if the floor is uneven Place all assembled leg sets together using the bottom rails and fully tighten the M8x16mm bolts to lock all legs together Place the steel strap onto the upper wrists with the raised areas of the straps slotting into the holes on the upper wri...

Страница 5: ...ed on the bottom of each upper wrist Slide each top rail through the upper wrists making sure they are located in the centre of the frame Snap the plastic support brackets onto the centre of each top rail The frame assembly is now complete Place the top rail caps into the exposed holes on each end of the frame assembly ...

Страница 6: ...as one solid piece This should be done with the work surface sitting on the frame in its final position Fully tighten all M5x30mm screws through each upper wrist into the work surface Fully tighten all M5x20mm screws through each steel strap and plastic support into the work surface 13 Optional For extra strength the plastic support brackets can be screwed onto the top rails ...

Отзывы: