5.3 General description of burner operation
PI diagram, oil and gas use
B-535V+O ver. 2
Pos.
Item
Pos.
Item
1
Ball valve
18
Pressure switch
2
Oil filter
19
Butterfly valve
3
Oil pump
20
Servomotor
5
Solenoid valve
21
Servomotor
7
Solenoid valve
22
Differential air pressure switch
14
Ball valve
23
Flame detector
15
Pressure switch
A
Oil to burner
16
Solenoid valve
B
Oil to tank
17
Actuator
C
Gas to burner
Burner start-up: Pre-purging, ignition
During pre-purge, the burner fan ventilates the boiler and chimney. At the time, the fuel
valves are closed. The fan creates a full air pressure before fuel inlet. Air in the boiler
and in the smoke flue will be circulated, which reduces the pressure, developing in
combustion chamber during flame ignition.
After the pre-purge, the servomotors run to the ignition position, the ignition begins, and
the fuel valves open. Fuel releases to the nozzle, and ignites by spark. Ignition ends
after time determined by the burner control. The flame burns with set ignition load.
M5164 1640EN
67 (95)
Содержание GKP-50 MH
Страница 2: ......
Страница 21: ...3 3 Installing burner GKP 50 MH main dimensions D048897 ver 3 M5164 1640EN 19 95...
Страница 98: ...96 95 M5164 1640EN...
Страница 99: ......
Страница 100: ...Tarmontie 4 FI 15860 HOLLOLA FINLAND Tel 358 3 85 761 Fax 358 3 857 6239 Email info oilon com www oilon com...