OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
36
UCA
Connecting the Cell
1. Carefully place the cell into the heating jacket.
Make sure the transducer is pressed down completely in the bottom of the
heating jacket.
2. Align the cell as shown below.
3. Screw the
5/8
" connection on the supply line to the bulkhead connector.
Leave the connection slightly loose for now.
Make sure the arrow on the filter is pointed toward the cell.
4.
Screw the ⅝" connection on the high-pressure supply line to the port on
the test cell. Use a wrench to tighten it completely.
5. Now use a
5/8
" wrench to tighten the supply line to the bulkhead connector
completely.
6.
Screw the thermocouple into the ⅝" port on the cell cap and leave it
loose. Plug the thermocouple into the port on the unit cabinet.
7. Plug the transducer into the port on the unit cabinet.
5/8
"
⅝"
⅝"
Supply Line
Filter
Bulkhead
Thermocouple
Port
Transducer
Port
Thermocouple