Compact / Series 7600 Installation Procedure
11
Installation
As you perform the steps in this procedure check them off on the Installation
Report/Checklist P/N 00-879038-02.
Additional information needed for operating the Compact / Series 7600 found
in the Operator Guide’s.
Site Requirements
There are three major considerations for installing a system. They are:
1.
Electrical power requirements
2.
Environmental conditions
3.
Safety precautions.
The system requires an input power source capable of providing nominal
voltage inputs of:
115 VAC @ 15 Amps
230 VAC @ 8 Amps
The site must meet the line voltage regulation requirements as described in the
Installation Report/Checklist.
The customer is responsible for preparing the building, equipment, environment
and services required to install and operate the system.
Installation Kit Contents
Verify that the following materials arrived in the 7600 Installation Kit
(00-879040-01). Note any shortages on the Checklist.
•
Beam Film Labels
•
FDA Form 2579
•
FSP-10 Installation Paperwork Requirements SOP
•
Installation Procedure (This Document)
•
Installation Report/Checklist P/N 00-879038-03
•
Manual Response Form
•
Various
Envelopes