FIG. 65
Once you have adjusted the cables according to the Cable
Adjustment Diagram on the previous page, then locate the two
Weight
Shrouds (#22)
and attach them to the
Guide Rod Retainer Housing
(#20)
. Attach the two
Weight Shrouds (#22)
to the top of the
Guide Rod
Retainer Housing (#20)
and secure them into the U-Nuts 1/4” (#85-Not
shown) using four Hex Head Cap Screws 1/4-20 X 3/4 (#97) and four
Nylon Washers 1/4 USS (#78). Refer to
Fig.71
on page 27 for further
illustration of this assembly.
FIG. 66
Next, attach the bottom of the two
Weight Shrouds (#22)
to
the
Base Frame (#2)
.
Secure the two
Weight Shrouds (#22)
to the
Base Frame (#2)
and secure them into the U-Nuts 1/4” (#85-Not shown)
using four Hex Head Cap Screws 1/4-20 X 3/4 (#97) and four Nylon
Washers 1/4 USS (#78). Refer to
Fig.71
on page 27 for further
illustration of this assembly.
Fully Fasten
: Proceed to align and fully fasten this hardware as-
sembly and all the previous assemblies that were left loosely fas-
tened.
FULLY FASTEN
Owner’s Manual: Assembly Instructions
ODY-5 Odyssey Home Gym
20
Содержание ODY-5
Страница 23: ...CABLE MAPPING DIAGRAM FOR Leg Extension Abdominal Cable 38 FIG B FIG A ODY 5 Odyssey Home Gym 22 ...
Страница 24: ...CABLE MAPPING DIAGRAM FOR Pec Dec Cable 39 FIG A 23 ODY 5 Odyssey Home Gym ...
Страница 25: ...CABLE MAPPING DIAGRAM FOR Tension Cable 40 FIG B FIG A ODY 5 Odyssey Home Gym 24 ...
Страница 28: ...FIG 67 FIG 68 FIG 69 FIG 70 FIG 71 27 ODY 5 Odyssey Home Gym ...
Страница 35: ...ODY 5 Odyssey Home Gym 34 N o t e s ...