5.9 Heat source brine connection
The sizing and installation of the brine collector is
the responsibility of the installer and is to be car-
ried out according to OCHSNER guidelines. The
heat source connection is to be executed in such a
way that the brine circuit can be flushed and/or
bled at any time. The amount of heat carrier fluid
required is to be calculated beforehand. This is a
product of the pipework length and pipe dimen-
sion as well as the heat pump water content The
heat carrier fluid is to be poured into a clean con-
tainer in one pour and well stirred.
Ethylene glycol in a mixture of 25%-30% by volume
is to be used as anti-freeze, this providing protec-
tion
down to
–
12 to
–
15°C
.
The anti-freeze fluid must not be mixed with ag-
gressive raw water (pH-value below 7.0), distilled
water
or rain water.
NOTE:
As the protection against corrosion de-
creases in the course of time, a two-
yearly water quality check is recom-
mended
The frost protection, the pH-value, as well as the
rest alkalinity are to be checked. This check is to
be carried out with a representative quantity (for
instance. 3x 1/4l). The correct mix relationship is
to be tested with a refractometer. The filling is to
be carried out in such a way as to ensure the
proper bleeding of the system
In order to ensure a reliable operation,
a temperature difference of 3K
between the evaporator (heat source)
flow and return
is to be maintained.
The flow rate in the pipe-network
must
not exceed 0.8 m/s.
(noise/resistance).
5.10 Flow rate metering brine
The flow rate meter is part of the heat pump and
must be installed by the system installer according
to the OCHSNER installation guidelines. Please ob-
serve the instructions in the installation manual
for flow rate measuring meters. If the flow rate
meter is either not installed, or incorrectly in-
stalled, OCHSNER will
not undertake the commis-
sioning
of the system.
OCHSNER accepts no liability for possi-
ble damage which may occur if the flow
rate meter is either not installed, incor-
rectly installed, sized or wired up.
Fig. 14:
Flow meter installation in heat source brine system
5.10.1 Collection shaft
If a collection shaft is to be installed, a
lined conduit with a slope towards the collecting
shaft
is to be used.
Fig. 15:
Collection shaft
Содержание AQUA 54
Страница 2: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 2 of 72 ...
Страница 44: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 44 of 72 12 16 Electrical circuit diagrams ...
Страница 45: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 45 of 72 ...
Страница 46: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 46 of 72 ...
Страница 47: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 47 of 72 ...
Страница 48: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 48 of 72 13 Disassembly assembly panel ...
Страница 51: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 51 of 72 2 screws on the back remove 4 mm Allen key ...
Страница 56: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 56 of 72 The two lateral wooden beams screw Hold with spanner ...
Страница 58: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 58 of 72 14 Declaration of Conformity ...
Страница 59: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 59 of 72 ...
Страница 60: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 60 of 72 ...
Страница 61: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 61 of 72 ...
Страница 69: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 69 of 72 ...
Страница 70: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 70 of 72 ...
Страница 71: ...BA OCHSNER AQUA TERRA_EN_V01 1 docx Page 71 of 72 ...