982017-AIR-BASIC-Multitower-T201-EN01.docx
Page 30 of 60
Step 2 of 3
Flare the pipe ends. The pipe ends must be
deburred before flaring!
Step 3 of 3
Push on the flared pipes (C) and screw on.
Figure 38:
Connecting the flared fitting
5.2 Indoor unit connections
CAUTION
The refrigeration connections are located on the
top of the indoor unit. Customer service will solder
them in this location during commissioning. Do
not bend these pipes. Bend the pipes coming from
the outdoor unit for connection.
Soldering is performed by customer service during
commissioning.
Fit heat-proof and vapour diffusion-proof
insulation to the refrigerant lines.
5.3 Leakage test
OCHSNER customer service will perform and
record the leakage test during commissioning.
A
B
C
NOTE
Figure 39:
View of T201 indoor unit
Содержание AIR BASIC 211 T201
Страница 50: ...982017 AIR BASIC Multitower T201 EN01 docx Page 50 of 60 11 8 Declaration of conformity...
Страница 51: ...982017 AIR BASIC Multitower T201 EN01 docx Page 51 of 60...
Страница 52: ...982017 AIR BASIC Multitower T201 EN01 docx Page 52 of 60...
Страница 53: ...982017 AIR BASIC Multitower T201 EN01 docx Page 53 of 60...
Страница 54: ...982017 AIR BASIC Multitower T201 EN01 docx Page 54 of 60 11 9 ERP Data...
Страница 55: ...982017 AIR BASIC Multitower T201 EN01 docx Page 55 of 60...
Страница 57: ...982017 AIR BASIC Multitower T201 EN01 docx Page 57 of 60...
Страница 58: ...982017 AIR BASIC Multitower T201 EN01 docx Page 58 of 60...
Страница 59: ...982017 AIR BASIC Multitower T201 EN01 docx Page 59 of 60...