BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07.docx
Page 22 of 68
For the system installer
The OCHSNER Customer Service engineer/ Cus-
tomer Service partner will execute the user-
specific settings according to the specifications in
the system data sheet. Should the system install-
er not be present during commissioning, or if
there is no fully completed system data sheet
present, the system will be commissioned using
the control's factory settings.
1)
OCHSNER accepts no liability for possible
malfunctioning (heating curve too low, biva-
lent point too high, etc.). Any claims result-
ing from this will be invoiced to the system
installer.
2)
In order to run the system economically, it is
absolutely necessary that the system be bal-
anced hydraulically and that the control set-
tings are coordinated to the system re-
quirements.
3)
Other necessary work performed, such as
bleeding the system, electrical wiring, addi-
tional instruction etc., that do not fall within
the realm of the OCHSNER firm’s duties will
be invoiced separately
Commissioning OCHSNER
Commissioning requests are to be made to
OCHSNER Customer Service. A date for commis-
sioning can only be made when the completed
and signed commissioning form is handed in.
Please make appointments for fixed commission-
ing dates at least 2 weeks in advance.
To undergo the commissioning process, the fol-
lowing work should be complete:
-
The heating and hot-water systems must be
completely installed, filled, bled, and hydrau-
lically adjusted.
-
The electric connection from the main circuit
3x400V/50Hz and control voltage 230V/50Hz
and other electrical installations on the build-
ing site must be completed. Confirmation of
proper field rotation, no provisional modifica-
tions!
Work that needs to be carried out by OCHSNER:
-
Laying and connecting the refrigerant pipe-
work
-
Seal of the refrigerator pipework
-
Evacuation of the refrigerant pipework
-
Insulating the refrigerant pipework (only in
the internal area of the system)
-
Filling the system with the correct refrigerant
quantity
-
Calibrating the safety equipment
-
Controlling the switching sequence
-
Preparation of a commissioning report
-
Basic control settings (according to system
installer)
-
Introduction and explanation of the system
to the operator (assuming present at com-
missioning, otherwise by system partner or,
at extra charge, at another date).
Содержание AIR 80 C13A
Страница 2: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 2 of 68...
Страница 45: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 45 of 68 10 Electrical circuit diagrams AIR 80 C13A...
Страница 46: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 46 of 68...
Страница 47: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 47 of 68...
Страница 48: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 48 of 68...
Страница 49: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 49 of 68...
Страница 50: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 50 of 68...
Страница 51: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 51 of 68 11 Electrical circuit diagrams AIR 80 C22A...
Страница 52: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 52 of 68...
Страница 53: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 53 of 68...
Страница 54: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 54 of 68...
Страница 55: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 55 of 68...
Страница 56: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 56 of 68...
Страница 62: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 62 of 68 13 Declaration of Conformity...
Страница 63: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 63 of 68...
Страница 64: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 64 of 68 14 ERP Data...
Страница 65: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 65 of 68...
Страница 67: ...BA_AIR_80_C13A_AIR_80_C22A_OTE3_SW5x_EN_V07 docx Page 67 of 68...