8.4.
Final placement
When deciding on the location for the Aqua Cool, sufficient
space around the air handling unit should be taken into
account to allow for operation and the work to be carried out.
At least 1 metre should be available at the front. The unit must
be able to suck in and extract air freely.
Ensure good and safe accessibility, and where necessary,
provide railings and/or fall protection, e.g. when positioning
the unit close to the roof edge.
The Aqua Cool should be set up level and placed flush with
the ground frame on a stable surface so that the inspection
panels / doors can be opened and closed easily.
8.5.
Installation
Electrics connection, see photo.
Main switch 40A
5-pin plug 32A